Permit: TR-FBR-1126-00065
Permit Details
Apply Date:
11/18/2026
Applicant:
Alex Abril
Description:
Grant road from Bryant ave to Tanque Verde. Continue east on Tanque Verde to Wrightstown. Wrightstown to Pantano. For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run. The conduit is located within the Centurylink manhole system. Our contractor will lift the manhole lid to access the manhole and perform the required work. The contractor will be at each manhole for 30 minutes to an hour. Each run takes approximately 2-3 days.
Permit Reviews
Permit Number - TR-FBR-1126-00065
Permit Status: Issued
Permit Description: Grant road from Bryant ave to Tanque Verde. Continue east on Tanque Verde to Wrightstown. Wrightstown to Pantano. For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run. The conduit is located within the Centurylink manhole system. Our contractor will lift the manhole lid to access the manhole and perform the required work. The contractor will be at each manhole for 30 minutes to an hour. Each run takes approximately 2-3 days.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/19/2026 | RIGHT-OF-WAY SIMPLE REVIEW v.1 | 11/19/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-FBR-1126-00065
Permit Status: Issued
Permit Description: Grant road from Bryant ave to Tanque Verde. Continue east on Tanque Verde to Wrightstown. Wrightstown to Pantano. For conduit proofing we will use either a rodder or an air compressor depending on the length of the conduit run. The conduit is located within the Centurylink manhole system. Our contractor will lift the manhole lid to access the manhole and perform the required work. The contractor will be at each manhole for 30 minutes to an hour. Each run takes approximately 2-3 days.
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 11/19/2026 | BUS STOP/ ROUTE |
| 11/19/2026 | LANDSCAPE |
| 11/19/2026 | PRE-ACTIVITY/CONTRUCTION MEETING |
| 11/19/2026 | SIDEWALK |
| 11/19/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 11/19/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 11/19/2026 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. |