Permit: TR-FBR-1126-00035
Permit Details
Apply Date:
11/03/2026
Applicant:
Andrew Thome-Hernandez
Description:
IDK #26 - 0591 - Tucson - Zone 204.2 Permit SOW: Scope of Work falls between E Victoria St to E Barrow St and between S Calle Polar and S Anchorage Ave. Ideatek is Expanding Fiber Optic Cable Network in Tucson. This fiber be placed in Tucson Road Right of Way. Fiber will be buried min 36" deep in ROW. Work will be done with Directional Bore Machines by placing 1.25"-2" Sch 40 Orange Duct. Backbone fiber Count ranges from 48ct up 96ct and pulled through duct. Vault and service pedestals to be placed along route to serve as splicing points. PLEASE SEE ATTACHED APPROVED SITE PLANS AND TCP FOR BETTER DETAILS. Ideatek Project Manager Contact: Ron Willey 816-661-7440 rwilley@ideatek.com
Permit Reviews
Permit Number - TR-FBR-1126-00035
Permit Status: Inspections
Permit Description: IDK #26 - 0591 - Tucson - Zone 204.2
Permit SOW: Scope of Work falls between E Victoria St to E Barrow St and between S Calle Polar and S Anchorage Ave.
Ideatek is Expanding Fiber Optic Cable Network in Tucson. This fiber be placed in Tucson Road Right of Way. Fiber will be buried min 36" deep in ROW. Work will be done with Directional Bore Machines by placing 1.25"-2" Sch 40 Orange Duct. Backbone fiber Count ranges from 48ct up 96ct and pulled through duct. Vault and service pedestals to be placed along route to serve as splicing points.
PLEASE SEE ATTACHED APPROVED SITE PLANS AND TCP FOR BETTER DETAILS.
Ideatek Project Manager Contact:
Ron Willey
816-661-7440
rwilley@ideatek.com
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/04/2026 | RIGHT-OF-WAY SIMPLE REVIEW v.2 | N/A | APPROVED |
| 11/03/2026 | RIGHT-OF-WAY SIMPLE REVIEW v.1 | 11/03/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-FBR-1126-00035
Permit Status: Inspections
Permit Description: IDK #26 - 0591 - Tucson - Zone 204.2
Permit SOW: Scope of Work falls between E Victoria St to E Barrow St and between S Calle Polar and S Anchorage Ave.
Ideatek is Expanding Fiber Optic Cable Network in Tucson. This fiber be placed in Tucson Road Right of Way. Fiber will be buried min 36" deep in ROW. Work will be done with Directional Bore Machines by placing 1.25"-2" Sch 40 Orange Duct. Backbone fiber Count ranges from 48ct up 96ct and pulled through duct. Vault and service pedestals to be placed along route to serve as splicing points.
PLEASE SEE ATTACHED APPROVED SITE PLANS AND TCP FOR BETTER DETAILS.
Ideatek Project Manager Contact:
Ron Willey
816-661-7440
rwilley@ideatek.com
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 11/05/2026 | Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley. |
| 11/05/2026 | Pavement Moratorium: |
| 11/05/2026 | Private easment |
| 11/05/2026 | SIDEWALK |
| 11/06/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-FBR-1126-00035
Permit Description: IDK #26 - 0591 - Tucson - Zone 204.2
Permit SOW: Scope of Work falls between E Victoria St to E Barrow St and between S Calle Polar and S Anchorage Ave.
Ideatek is Expanding Fiber Optic Cable Network in Tucson. This fiber be placed in Tucson Road Right of Way. Fiber will be buried min 36" deep in ROW. Work will be done with Directional Bore Machines by placing 1.25"-2" Sch 40 Orange Duct. Backbone fiber Count ranges from 48ct up 96ct and pulled through duct. Vault and service pedestals to be placed along route to serve as splicing points.
PLEASE SEE ATTACHED APPROVED SITE PLANS AND TCP FOR BETTER DETAILS.
Ideatek Project Manager Contact:
Ron Willey
816-661-7440
rwilley@ideatek.com
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/10/2026 | Pre-Activity Field Meeting | Passed | Met on-site with crew. Erick from E&E was advised entire area under moratorium. Advised of all moratorium requirements. Erick advised most work would be done in dirt alleys. Erick advised contact would be made regarding trash pick up to ensure no interruption. Erick asked about working Saturdays and closing alleys overnight (if needed). I reached out to Dan and Mike COT. Both advised requests would need to be submitted. I advised crews that any potholes in alley were required to have complete compaction due to trash trucks and utilities using alleyways. I also advised of securing open excavations and overnight barricade requirements. Crew advised work could potentially start next week. |