Permit Details

Status:
Issued
Type:
Fiber Permit
Address NEW:
6509 E GOLF LINKS RD
Apply Date:
09/24/2026
Applicant:
Andrew Thome-Hernandez
Description:
Ideatek is Expanding Fiber Optic Cable Network in Tucson. Permit SOW: boring fiber on the north side of Golf Links, starting with first vault placement just east of Calle Polar. Boring will stay on the North side, and will travel west, cross Wilmot and end with vault on west side of Sahuara ave. General note: Fiber will be buried min 36" deep in ROW. Work will be done with Directional Bore Machines by placing 1.25"-2" Sch 40 Orange Duct. Backbone fiber Count ranges from 96ct up 432ct and pulled through duct. Vault and service pedestals to be placed along route to serve as splicing points.

Permit Reviews

Permit Number - TR-FBR-0926-00014
Permit Status: Issued
Permit Description: Ideatek is Expanding Fiber Optic Cable Network in Tucson. Permit SOW: boring fiber on the north side of Golf Links, starting with first vault placement just east of Calle Polar. Boring will stay on the North side, and will travel west, cross Wilmot and end with vault on west side of Sahuara ave. General note: Fiber will be buried min 36" deep in ROW. Work will be done with Directional Bore Machines by placing 1.25"-2" Sch 40 Orange Duct. Backbone fiber Count ranges from 96ct up 432ct and pulled through duct. Vault and service pedestals to be placed along route to serve as splicing points.
Start Date Submittal Complete Date Status  
09/25/2026 RIGHT-OF-WAY SIMPLE REVIEW v.1 N/A APPROVED Review Details
09/24/2026 RIGHT-OF-WAY SIMPLE REVIEW v.1 09/24/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-FBR-0926-00014
Permit Status: Issued
Permit Description: Ideatek is Expanding Fiber Optic Cable Network in Tucson. Permit SOW: boring fiber on the north side of Golf Links, starting with first vault placement just east of Calle Polar. Boring will stay on the North side, and will travel west, cross Wilmot and end with vault on west side of Sahuara ave. General note: Fiber will be buried min 36" deep in ROW. Work will be done with Directional Bore Machines by placing 1.25"-2" Sch 40 Orange Duct. Backbone fiber Count ranges from 96ct up 432ct and pulled through duct. Vault and service pedestals to be placed along route to serve as splicing points.
Total Outstanding Activity Conditions - 3
Date Name
09/25/2026 BUS STOP/ ROUTE
09/25/2026 Traffic control set-up approved between 9AM - 3:30PM
09/25/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Documents

File Name Document Type  
00014 APPROVED TCP CB-TUCSON 955 - S KOLB TO E GOLF LINKS RD TO E 22ND ST 432.2.PDF DOCUMENTS VIEW
SITE-PLOT PLAN-LOCATION MAP DTM-APPROVED PLAN CB-TUCSON 955 - S KOLB TO E GOLF LINKS RD TO E 22ND ST 432.2-A2_V2.PDF DOCUMENTS VIEW