Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Annual
Apply Date:
10/30/2022
Applicant:
Andrea Flood
Description:
INSTALLATION OF DRIVEWAYS AND SIDEWALKS AT THE FOLLOWING LOCATIONS: 9756 E CRYSTAL POINT TR, 9748 E CRYSTAL POINT TR, 9740 E CRYSTAL POINT TR, 9732 E CRYSTAL POINT TR

Completed Inspections

Permit Status: Complete
Permit Number: TR-ANN-1022-00003
Permit Description: INSTALLATION OF DRIVEWAYS AND SIDEWALKS AT THE FOLLOWING LOCATIONS: 9756 E CRYSTAL POINT TR, 9748 E CRYSTAL POINT TR, 9740 E CRYSTAL POINT TR, 9732 E CRYSTAL POINT TR
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/20/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
03/01/2023 TRSP - ROW - Final/Close-Out Passed
03/01/2023 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) Passed

Documents

File Name Document Type  
262_V1.PDF DOCUMENTS VIEW
263_V1.PDF DOCUMENTS VIEW
264_V1.PDF DOCUMENTS VIEW
265_V1.PDF DOCUMENTS VIEW
STIII 262 - ROW APP_V1.PDF DOCUMENTS VIEW
STIII 263 - ROW APP_V1.PDF DOCUMENTS VIEW
STIII 264 - ROW APP_V1.PDF DOCUMENTS VIEW
STIII 265 - ROW APP_V1.PDF DOCUMENTS VIEW