Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Annual
Address NEW:
9538 E WYNALDA DR
Apply Date:
09/08/2026
Applicant:
Celina Rodriguez
Description:
Mirador Point Lot 164 ROW Permit Install 5' Sidewalk and Driveway Apron Per COT SD's 200 and 206

Permit Reviews

Permit Number - TR-ANN-0926-00267
Permit Status: Inspections
Permit Description: Mirador Point Lot 164 ROW Permit Install 5' Sidewalk and Driveway Apron Per COT SD's 200 and 206
Start Date Submittal Complete Date Status  
09/09/2026 RIGHT-OF-WAY REVIEW HOME DEVELOPER v.1 N/A APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ANN-0926-00267
Permit Status: Inspections
Permit Description: Mirador Point Lot 164 ROW Permit Install 5' Sidewalk and Driveway Apron Per COT SD's 200 and 206
Total Outstanding Activity Conditions - 2
Date Name
09/11/2026 Install 5' Sidewalk and Driveway Apron Per COT SD's 200 and 206
09/11/2026 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Inspections
Permit Number: TR-ANN-0926-00267
Permit Description: Mirador Point Lot 164 ROW Permit Install 5' Sidewalk and Driveway Apron Per COT SD's 200 and 206
Total Completed Inspections - 1
Date Description Inspector Results Comments
09/22/2026 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) Passed Subgrade compaction and depth have been checked and approved, safety caps are in place. Please ensure expansion joints are installed properly and all debris is removed from base prior to concrete pour.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
MIRADOR POINT - LOT 164 START_V1.PDF DOCUMENTS VIEW