Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Annual
Address NEW:
6131 E CAMPOLINA TR
Apply Date:
09/16/2025
Applicant:
Helen Ormsby
Description:
Blackhawk H30A Model Plan BHK LOT 30 ROW Installation of driveway pad NOTE: Refer to Permit #TR-ANN-0925-00300 for one time ROW barricade fee.

Permit Reviews

Permit Number - TR-ANN-0925-00305
Permit Status: Inspections
Permit Description: Blackhawk H30A Model Plan BHK LOT 30 ROW Installation of driveway pad NOTE: Refer to Permit #TR-ANN-0925-00300 for one time ROW barricade fee.
Start Date Submittal Complete Date Status  
09/16/2025 RIGHT-OF-WAY REVIEW HOME DEVELOPER v.1 09/17/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ANN-0925-00305
Permit Status: Inspections
Permit Description: Blackhawk H30A Model Plan BHK LOT 30 ROW Installation of driveway pad NOTE: Refer to Permit #TR-ANN-0925-00300 for one time ROW barricade fee.
Total Outstanding Activity Conditions - 2
Date Name
11/07/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/07/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Completed Inspections

Permit Status: Inspections
Permit Number: TR-ANN-0925-00305
Permit Description: Blackhawk H30A Model Plan BHK LOT 30 ROW Installation of driveway pad NOTE: Refer to Permit #TR-ANN-0925-00300 for one time ROW barricade fee.
Total Completed Inspections - 2
Date Description Inspector Results Comments
01/14/2026 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) Passed Site is ready for concrete
02/10/2026 TRSP - ROW - Concrete - Acceptance (Post-Pour) Passed Work is complete