Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Annual
Apply Date:
09/15/2023
Applicant:
John Sutton
Description:
LA Estancia De Tucson Phase 2 - lot 63 - INSTALL 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206 6815 E Camino Naife SFR LE23003 T22-M0056

Permit Reviews

Permit Number - TR-ANN-0923-00360
Permit Status: Complete
Permit Description: LA Estancia De Tucson Phase 2 - lot 63 - INSTALL 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206 6815 E Camino Naife SFR LE23003 T22-M0056
Start Date Submittal Complete Date Status  
09/15/2023 RIGHT-OF-WAY REVIEW v.1 09/15/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ANN-0923-00360
Permit Status: Complete
Permit Description: LA Estancia De Tucson Phase 2 - lot 63 - INSTALL 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206 6815 E Camino Naife SFR LE23003 T22-M0056
Total Outstanding Activity Conditions - 2
Date Name
07/13/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/13/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ANN-0923-00360
Permit Description: LA Estancia De Tucson Phase 2 - lot 63 - INSTALL 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206 6815 E Camino Naife SFR LE23003 T22-M0056
Total Completed Inspections - 2
Date Description Inspector Results Comments
11/21/2023 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) Passed
04/08/2024 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
LE 2_2_63 SITE PLAN_V1.PDF DOCUMENTS VIEW