Permit: TR-ANN-0826-00250
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Annual
Address:
9529 E MEOLA DR
Address NEW:
9529 E MEOLA DR
Apply Date:
08/25/2026
Applicant:
Celina Rodriguez
Description:
Mirador Point Lot 155 ROW Permit *Installation of Sidewalk per PAG SD 200 and Driveway per PAG SD 206
Permit Reviews
Permit Number - TR-ANN-0826-00250
Permit Status: Inspections
Permit Description: Mirador Point Lot 155 ROW Permit
*Installation of Sidewalk per PAG SD 200 and Driveway per PAG SD 206
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/25/2026 | RIGHT-OF-WAY REVIEW HOME DEVELOPER v.1 | N/A | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ANN-0826-00250
Permit Status: Inspections
Permit Description: Mirador Point Lot 155 ROW Permit
*Installation of Sidewalk per PAG SD 200 and Driveway per PAG SD 206
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 08/26/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ANN-0826-00250
Permit Description: Mirador Point Lot 155 ROW Permit
*Installation of Sidewalk per PAG SD 200 and Driveway per PAG SD 206
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/02/2026 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | subgrade, compaction and depths have been checked and verified, told Jack with KB homes that all sides of driveway will need 6 inch joint and loose debris will need to be removed prior to concrete pour | |
| 09/10/2026 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed |