Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Right-of-Way (ROW) - Annual
Address NEW:
9593 E WYNALDA DR
Apply Date:
08/05/2026
Applicant:
Celina Rodriguez
Description:
Mirador Point Lot 188 ROW Permit Installation of Sidewalk per PAG SD 200 and Driveway per PAG SD 206

Permit Reviews

Permit Number - TR-ANN-0826-00233
Permit Status: Inspections complete
Permit Description: Mirador Point Lot 188 ROW Permit Installation of Sidewalk per PAG SD 200 and Driveway per PAG SD 206
Start Date Submittal Complete Date Status  
08/05/2026 RIGHT-OF-WAY REVIEW HOME DEVELOPER v.1 N/A APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ANN-0826-00233
Permit Status: Inspections complete
Permit Description: Mirador Point Lot 188 ROW Permit Installation of Sidewalk per PAG SD 200 and Driveway per PAG SD 206
Total Outstanding Activity Conditions - 1
Date Name
08/10/2026 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TR-ANN-0826-00233
Permit Description: Mirador Point Lot 188 ROW Permit Installation of Sidewalk per PAG SD 200 and Driveway per PAG SD 206
Total Completed Inspections - 2
Date Description Inspector Results Comments
08/19/2026 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) Passed subgrade depth and compaction checked and verified, safety caps and joints in place, approved
09/21/2026 TRSP - ROW - Concrete - Acceptance (Post-Pour) Passed grades, expansion joints, and surfaces have all been checked and verified, approved

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW