Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ANN-0824-00501
Permit Details
Apply Date:
08/29/2024
Applicant:
Joshua Swinney
Description:
Very urgent, can you please issue me a row permit so we can pour our sidewalk and driveway here. Lot 214 La Escalera Phase 1 NOTE: Refer to Permit #TR-ANN-0824-00500 for one time ROW barricade fee.
Permit Reviews
Permit Number - TR-ANN-0824-00501
Permit Status: Complete
Permit Description: Very urgent, can you please issue me a row permit so we can pour our sidewalk and driveway here.
Lot 214
La Escalera Phase 1
NOTE: Refer to Permit #TR-ANN-0824-00500 for one time ROW barricade fee.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/29/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/29/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ANN-0824-00501
Permit Status: Complete
Permit Description: Very urgent, can you please issue me a row permit so we can pour our sidewalk and driveway here.
Lot 214
La Escalera Phase 1
NOTE: Refer to Permit #TR-ANN-0824-00500 for one time ROW barricade fee.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
12/12/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
12/12/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ANN-0824-00501
Permit Description: Very urgent, can you please issue me a row permit so we can pour our sidewalk and driveway here.
Lot 214
La Escalera Phase 1
NOTE: Refer to Permit #TR-ANN-0824-00500 for one time ROW barricade fee.
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/13/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | forms and Subgrade approved, please ensure Subgrade is wetted prior to pour | |
09/30/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | approved |