Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Right-of-Way (ROW) - Annual
Apply Date:
08/14/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra III Lot 29 ROW Permit - Bella Tierra Phase 3 - Lot 29 - INSTALL 40' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206

Permit Reviews

Permit Number - TR-ANN-0824-00476
Permit Status: Issued
Permit Description: Bella Tierra III Lot 29 ROW Permit - Bella Tierra Phase 3 - Lot 29 - INSTALL 40' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206
Start Date Submittal Complete Date Status  
08/15/2024 RIGHT-OF-WAY REVIEW v.1 08/15/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ANN-0824-00476
Permit Status: Issued
Permit Description: Bella Tierra III Lot 29 ROW Permit - Bella Tierra Phase 3 - Lot 29 - INSTALL 40' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206
Total Outstanding Activity Conditions - 3
Date Name
08/15/2024 Traffic Control set-up approved between 7AM - 5PM
11/22/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/22/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Completed Inspections

Permit Status: Issued
Permit Number: TR-ANN-0824-00476
Permit Description: Bella Tierra III Lot 29 ROW Permit - Bella Tierra Phase 3 - Lot 29 - INSTALL 40' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206
Total Completed Inspections - 1
Date Description Inspector Results Comments
08/15/2024 TRSP - ROW - SITE INSPECTION Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 29 START_V1.PDF DOCUMENTS VIEW