Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ANN-0824-00473
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Annual
Address:
9105 E RED BLUFF CT
Address NEW:
9105 E RED BLUFF CT
Apply Date:
08/14/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra III Lot 26 ROW Permit - Bella Tierra Phase 3 - Lot 26 - INSTALL 33' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206
Permit Reviews
Permit Number - TR-ANN-0824-00473
Permit Status: Complete
Permit Description: Bella Tierra III Lot 26 ROW Permit - Bella Tierra Phase 3 - Lot 26 - INSTALL 33' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/15/2024 | RIGHT-OF-WAY REVIEW v.1 | 08/15/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ANN-0824-00473
Permit Status: Complete
Permit Description: Bella Tierra III Lot 26 ROW Permit - Bella Tierra Phase 3 - Lot 26 - INSTALL 33' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 08/15/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 11/22/2023 | THIS DOES NOT APPLY |
| 11/22/2023 | THIS DOES NOT APPLY |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ANN-0824-00473
Permit Description: Bella Tierra III Lot 26 ROW Permit - Bella Tierra Phase 3 - Lot 26 - INSTALL 33' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/19/2024 | TRSP - ROW - SITE INSPECTION | Passed | ||
| 08/13/2025 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | Old permit, checking that work is indeed complete | |
| 08/13/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | old permit, checking work is complete |