Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Annual
Apply Date:
07/30/2024
Applicant:
Celina Rodriguez
Description:
Bella Tierra III Lot 36 ROW Permit - Bella Tierra Phase 3 - Lot 36 - INSTALL 40' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206 - (Applied required Barricade fee to this location - as first permit request along Verdin Valley)

Permit Reviews

Permit Number - TR-ANN-0724-00454
Permit Status: Complete
Permit Description: Bella Tierra III Lot 36 ROW Permit - Bella Tierra Phase 3 - Lot 36 - INSTALL 40' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206 - (Applied required Barricade fee to this location - as first permit request along Verdin Valley)
Start Date Submittal Complete Date Status  
07/31/2024 RIGHT-OF-WAY REVIEW v.1 07/31/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ANN-0724-00454
Permit Status: Complete
Permit Description: Bella Tierra III Lot 36 ROW Permit - Bella Tierra Phase 3 - Lot 36 - INSTALL 40' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206 - (Applied required Barricade fee to this location - as first permit request along Verdin Valley)
Total Outstanding Activity Conditions - 3
Date Name
01/05/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
01/05/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
07/31/2024 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ANN-0724-00454
Permit Description: Bella Tierra III Lot 36 ROW Permit - Bella Tierra Phase 3 - Lot 36 - INSTALL 40' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206 - (Applied required Barricade fee to this location - as first permit request along Verdin Valley)
Total Completed Inspections - 2
Date Description Inspector Results Comments
08/06/2024 TRSP - ROW - SITE INSPECTION Passed
07/29/2025 TRSP - ROW - Final Passed Sidewalk is complete

Documents

File Name Document Type  
BELLA TIERRA PHASE 3 - LOT 36 REVISED START_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW