Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Annual
Address NEW:
6552 E CAMINO REBINA
Apply Date:
06/26/2024
Applicant:
Christi Swenson
Description:
SFR PULT3513-2 T21-M0056- DRIVEWAY PAD/ SIDEWALK INSTALLATION FOR LOT # 35

Permit Reviews

Permit Number - TR-ANN-0624-00373
Permit Status: Complete
Permit Description: SFR PULT3513-2 T21-M0056- DRIVEWAY PAD/ SIDEWALK INSTALLATION FOR LOT # 35
Start Date Submittal Complete Date Status  
06/26/2024 RIGHT-OF-WAY REVIEW v.1 06/26/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ANN-0624-00373
Permit Status: Complete
Permit Description: SFR PULT3513-2 T21-M0056- DRIVEWAY PAD/ SIDEWALK INSTALLATION FOR LOT # 35
Total Outstanding Activity Conditions - 1
Date Name
06/26/2024 Traffic Control set-up approved between 7AM - 5PM

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-ANN-0624-00373
Permite Description: SFR PULT3513-2 T21-M0056- DRIVEWAY PAD/ SIDEWALK INSTALLATION FOR LOT # 35
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/13/2024 TRSP - ROW - SITE INSPECTION N/A Re-inspection required

Completed Inspections

Permit Status: Complete
Permit Number: TR-ANN-0624-00373
Permit Description: SFR PULT3513-2 T21-M0056- DRIVEWAY PAD/ SIDEWALK INSTALLATION FOR LOT # 35
Total Completed Inspections - 2
Date Description Inspector Results Comments
06/24/2025 TRSP - ROW - Concrete - Acceptance (Post-Pour) Passed Sidewalk and driveway are constructed in accordance with COT standards
06/24/2025 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) Passed Work is complete, but no pre-pour inspection was ever requested

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
LE 03504_V1.PDF DOCUMENTS VIEW