Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Annual
Address NEW:
10013 E LEBARON DR
Apply Date:
05/05/2026
Applicant:
Celina Rodriguez
Description:
Mirador Ridge Blossom Lot 44 ROW Permit

Permit Reviews

Permit Number - TR-ANN-0526-00106
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom Lot 44 ROW Permit
Start Date Submittal Complete Date Status  
05/06/2026 RIGHT-OF-WAY REVIEW HOME DEVELOPER v.1 N/A APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ANN-0526-00106
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom Lot 44 ROW Permit
Total Outstanding Activity Conditions - 3
Date Name
05/06/2026 Install 5' Sidewalk and Driveway Apron Per PAG SD's 200 and 206
05/06/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
05/06/2026 Traffic Control set-up approved between 7AM - 5PM

Outstanding Inspections

Permit Status: Inspections
Permit Number: TR-ANN-0526-00106
Permite Description: Mirador Ridge Blossom Lot 44 ROW Permit
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
06/03/2026 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) N/A Not Ready subgrade compaction still needed
06/08/2026 TRSP - ROW - Concrete - Acceptance (Post-Pour) N/A Partial Pass grades and joints all look good, please check panel in front of water valve. Long surface scratch is present, see if surface treatment can restore.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
MIRADOR RIDGE - LOT 44 START_V1.PDF DOCUMENTS VIEW