Permit: TR-ANN-0526-00105
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Annual
Address:
9759 E PANOPEIA DR
Address NEW:
9759 E PANOPEIA DR
Apply Date:
05/05/2026
Applicant:
Celina Rodriguez
Description:
Mirador Ridge Blossom Lot 36 ROW Permit installation of sidewalk per SD 200 and driveway per SD 206, traffic control tied to TR-ANN-0526-00104
Permit Reviews
Permit Number - TR-ANN-0526-00105
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom Lot 36 ROW Permit installation of sidewalk per SD 200 and driveway per SD 206, traffic control tied to TR-ANN-0526-00104
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/06/2026 | RIGHT-OF-WAY REVIEW HOME DEVELOPER v.1 | N/A | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ANN-0526-00105
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom Lot 36 ROW Permit installation of sidewalk per SD 200 and driveway per SD 206, traffic control tied to TR-ANN-0526-00104
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 05/07/2026 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-ANN-0526-00105
Permite Description: Mirador Ridge Blossom Lot 36 ROW Permit installation of sidewalk per SD 200 and driveway per SD 206, traffic control tied to TR-ANN-0526-00104
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/08/2026 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | N/A | Partial Pass | grades and expansion joints all look good, last panel to the east has some minor surface damage. Please see what treatment can be done for smooth and uniform surface. |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ANN-0526-00105
Permit Description: Mirador Ridge Blossom Lot 36 ROW Permit installation of sidewalk per SD 200 and driveway per SD 206, traffic control tied to TR-ANN-0526-00104
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/29/2026 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | Subgrade, compaction and depths checked and verified, expansion joints, and safety caps in place, approved |