Permit: TR-ANN-0526-00094
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Annual
Address:
2142 E SUPERSONIC ST
Address NEW:
2142 E SUPERSONIC ST
Apply Date:
05/04/2026
Applicant:
Description:
Cielo Reserve Lot 17 ROW Permit
Permit Reviews
Permit Number - TR-ANN-0526-00094
Permit Status: Inspections
Permit Description: Cielo Reserve Lot 17 ROW Permit
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/05/2026 | RIGHT-OF-WAY REVIEW HOME DEVELOPER v.1 | N/A | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ANN-0526-00094
Permit Status: Inspections
Permit Description: Cielo Reserve Lot 17 ROW Permit
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 05/05/2026 | Install 5' Sidewalk and Driveway Apron Per PAG SD's 200 and 206 |
| 05/05/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 05/05/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-ANN-0526-00094
Permit Description: Cielo Reserve Lot 17 ROW Permit
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2026 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 06/22/2026 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed |