Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Annual
Address NEW:
9846 E GRAY HAWK DR
Apply Date:
05/14/2025
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35G Model Plan. DRIVEWAY PAD/ SIDEWALK INSTALLATION FOR LOT #25

Permit Reviews

Permit Number - TR-ANN-0525-00169
Permit Status: Complete
Permit Description: Casas del Cerrito H35G Model Plan. DRIVEWAY PAD/ SIDEWALK INSTALLATION FOR LOT #25
Start Date Submittal Complete Date Status  
05/14/2025 RIGHT-OF-WAY REVIEW HOME DEVELOPER v.1 05/14/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ANN-0525-00169
Permit Status: Complete
Permit Description: Casas del Cerrito H35G Model Plan. DRIVEWAY PAD/ SIDEWALK INSTALLATION FOR LOT #25
Total Outstanding Activity Conditions - 1
Date Name
05/14/2025 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-ANN-0525-00169
Permit Description: Casas del Cerrito H35G Model Plan. DRIVEWAY PAD/ SIDEWALK INSTALLATION FOR LOT #25
Total Completed Inspections - 2
Date Description Inspector Results Comments
09/08/2025 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) Passed Forms are solid and strait, compaction is good, and all stakes have been capped for safety
10/09/2025 TRSP - ROW - Concrete - Acceptance (Post-Pour) Passed Work is complete

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW