Permit: TR-ANN-0426-00085
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Annual
Address:
5959 E BENBURB LN
Address NEW:
5959 E BENBURB LN
Apply Date:
04/22/2026
Applicant:
Candis Benson
Description:
Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385) Rev 1 Installation of sidewalk per PAG SD 200 and driveway per PAG SD 206 Traffic control under TR-ANN-0426-00084
Permit Reviews
Permit Number - TR-ANN-0426-00085
Permit Status: Complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385) Rev 1 Installation of sidewalk per PAG SD 200 and driveway per PAG SD 206 Traffic control under TR-ANN-0426-00084
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/22/2026 | RIGHT-OF-WAY REVIEW HOME DEVELOPER v.1 | N/A | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ANN-0426-00085
Permit Status: Complete
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385) Rev 1 Installation of sidewalk per PAG SD 200 and driveway per PAG SD 206 Traffic control under TR-ANN-0426-00084
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 04/22/2026 | Installation of sidewalk per SD200 and installation of driveway per SD206 |
| 04/22/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ANN-0426-00085
Permit Description: Blackhawk B30G New SFR with/AVP (Model master plan TC-MDP-1224-01385) Rev 1 Installation of sidewalk per PAG SD 200 and driveway per PAG SD 206 Traffic control under TR-ANN-0426-00084
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/2026 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | Subgrade, compaction and depths all look good, safety caps are in place. Please use 6 inch expansion joint for driveway apron. | |
| 06/22/2026 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | grades and expansion joints have been checked and verified, please give sidewalk a full sweep and power wash at end of project for cleanliness, approved | |
| 07/31/2026 | TRSP - ROW - Final | Passed |