Permit: TR-ANN-0424-00216
Permit Details
Apply Date:
04/08/2024
Applicant:
Craig Morczynski
Description:
SFR LENNLE4005 T22-M0049 - La Estancia De Tucson Phase 2 Lot 15 - INSTALL 36' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206 -
Permit Reviews
Permit Number - TR-ANN-0424-00216
Permit Status: Issued
Permit Description: SFR LENNLE4005 T22-M0049 - La Estancia De Tucson Phase 2 Lot 15 - INSTALL 36' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206 -
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/09/2024 | RIGHT-OF-WAY REVIEW v.1 | 04/09/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ANN-0424-00216
Permit Status: Issued
Permit Description: SFR LENNLE4005 T22-M0049 - La Estancia De Tucson Phase 2 Lot 15 - INSTALL 36' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206 -
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
04/09/2024 | Traffic Control set-up approved between 7AM - 5PM |
07/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
07/14/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TR-ANN-0424-00216
Permite Description: SFR LENNLE4005 T22-M0049 - La Estancia De Tucson Phase 2 Lot 15 - INSTALL 36' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206 -
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/18/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | N/A | Re-inspection required | tile contractors must dump water someplace to contain sediment. foreman notified. |
Completed Inspections
Permit Status: Issued
Permit Number: TR-ANN-0424-00216
Permit Description: SFR LENNLE4005 T22-M0049 - La Estancia De Tucson Phase 2 Lot 15 - INSTALL 36' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206 -
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/30/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | passed, please install 4 inch expansion joint at East sidewalk |