Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-ANN-0324-00154
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Annual
Address:
7472 S CAMINO CARDAL
Address NEW:
7472 S CAMINO CARDAL
Apply Date:
03/15/2024
Applicant:
Craig Morczynski
Description:
SFR LENNLE4001 T22-M0045 LE II 26 LOT #26 Installation of driveway pad.
Permit Reviews
Permit Number - TR-ANN-0324-00154
Permit Status: Complete
Permit Description: SFR LENNLE4001 T22-M0045
LE II 26 LOT #26
Installation of driveway pad.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/15/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/15/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ANN-0324-00154
Permit Status: Complete
Permit Description: SFR LENNLE4001 T22-M0045
LE II 26 LOT #26
Installation of driveway pad.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 07/14/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
| 07/14/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-ANN-0324-00154
Permite Description: SFR LENNLE4001 T22-M0045
LE II 26 LOT #26
Installation of driveway pad.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/28/2024 | TRSP - ROW - SITE INSPECTION | N/A | Partial Pass |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ANN-0324-00154
Permit Description: SFR LENNLE4001 T22-M0045
LE II 26 LOT #26
Installation of driveway pad.
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/16/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | ||
| 10/01/2024 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | approved |