Permit: TR-ANN-0224-00121
Permit Details
Apply Date:
02/26/2024
Applicant:
John Sutton
Description:
SFR LE23003 T22-M0056- DRIVEWAY PAD/ SIDEWALK INSTALLATION FOR LOT #76 LEC 76
Permit Reviews
Permit Number - TR-ANN-0224-00121
Permit Status: Issued
Permit Description: SFR LE23003 T22-M0056- DRIVEWAY PAD/ SIDEWALK INSTALLATION FOR LOT #76
LEC 76
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/28/2024 | RIGHT-OF-WAY REVIEW v.1 | 02/28/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ANN-0224-00121
Permit Status: Issued
Permit Description: SFR LE23003 T22-M0056- DRIVEWAY PAD/ SIDEWALK INSTALLATION FOR LOT #76
LEC 76
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
02/28/2024 | Traffic Control set-up approved between 7AM - 5PM |
07/13/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
07/13/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TR-ANN-0224-00121
Permite Description: SFR LE23003 T22-M0056- DRIVEWAY PAD/ SIDEWALK INSTALLATION FOR LOT #76
LEC 76
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/16/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | N/A | Re-inspection required |
Completed Inspections
Permit Status: Issued
Permit Number: TR-ANN-0224-00121
Permit Description: SFR LE23003 T22-M0056- DRIVEWAY PAD/ SIDEWALK INSTALLATION FOR LOT #76
LEC 76
Total Completed Inspections - 1
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/09/2024 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | passed, please ensure stakes get caps before pour |