Permit: TR-ANN-0224-00114
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Annual
Address:
7621 S CAMINO ALMA VIEJA
Address NEW:
7621 S CAMINO ALMA VIEJA
Apply Date:
02/26/2024
Applicant:
John Sutton
Description:
SFR LE23002 T22-M0057- DRIVEWAY PAD/ SIDEWALK INSTALLATION FOR LOT #18 LEC 18
Permit Reviews
Permit Number - TR-ANN-0224-00114
Permit Status: Complete
Permit Description: SFR LE23002 T22-M0057- DRIVEWAY PAD/ SIDEWALK INSTALLATION FOR LOT #18
LEC 18
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/27/2024 | RIGHT-OF-WAY REVIEW v.1 | 03/04/2024 | REQUIRES RESUBMIT |
| 03/04/2024 | RIGHT-OF-WAY REVIEW v.2 | 03/04/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-ANN-0224-00114
Permit Status: Complete
Permit Description: SFR LE23002 T22-M0057- DRIVEWAY PAD/ SIDEWALK INSTALLATION FOR LOT #18
LEC 18
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 03/06/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 07/10/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
Conditions
Permit Number - TR-ANN-0224-00114
Permit Status: Complete
Permit Description: SFR LE23002 T22-M0057- DRIVEWAY PAD/ SIDEWALK INSTALLATION FOR LOT #18
LEC 18
| Date | Description | Comments |
|---|---|---|
| 07/10/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-ANN-0224-00114
Permit Description: SFR LE23002 T22-M0057- DRIVEWAY PAD/ SIDEWALK INSTALLATION FOR LOT #18
LEC 18
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/28/2025 | TRSP - ROW - Concrete - Acceptance (Post-Pour) | Passed | Driveway and sidewalk are within specifications | |
| 02/28/2025 | TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) | Passed | Work already completed, sidewalk and driveway already poured, and concrete subgrade inspection is no longer necessary. |