Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Annual
Apply Date:
02/26/2024
Applicant:
John Sutton
Description:
SFR LE23002 T22-M0057 - La Estancia De Tucson Phase 2 - Lot 74 - INSTALL 40' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206 LEC 74 6850 E PASEO BERCEO

Permit Reviews

Permit Number - TR-ANN-0224-00104
Permit Status: Complete
Permit Description: SFR LE23002 T22-M0057 - La Estancia De Tucson Phase 2 - Lot 74 - INSTALL 40' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206 LEC 74 6850 E PASEO BERCEO
Start Date Submittal Complete Date Status  
02/27/2024 RIGHT-OF-WAY REVIEW v.1 02/28/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-ANN-0224-00104
Permit Status: Complete
Permit Description: SFR LE23002 T22-M0057 - La Estancia De Tucson Phase 2 - Lot 74 - INSTALL 40' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206 LEC 74 6850 E PASEO BERCEO
Total Outstanding Activity Conditions - 1
Date Name
02/28/2024 Traffic Control set-up approved between 7AM - 5PM

Conditions

Permit Number - TR-ANN-0224-00104
Permit Status: Complete
Permit Description: SFR LE23002 T22-M0057 - La Estancia De Tucson Phase 2 - Lot 74 - INSTALL 40' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206 LEC 74 6850 E PASEO BERCEO
Date Description Comments
07/13/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
07/13/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Completed Inspections

Permit Status: Complete
Permit Number: TR-ANN-0224-00104
Permit Description: SFR LE23002 T22-M0057 - La Estancia De Tucson Phase 2 - Lot 74 - INSTALL 40' of 5’ SIDEWALK & DRIVEWAY APRON PER PAG SD’s 200 & 206 LEC 74 6850 E PASEO BERCEO
Total Completed Inspections - 3
Date Description Inspector Results Comments
05/16/2024 TRSP - ROW - Concrete - Subgrade/Forms (Pre-Pour) Passed completed by bell
05/15/2024 TRSP - ROW - SITE INSPECTION Passed site passes pre pour inspection
10/14/2024 TRSP - ROW - Concrete - Acceptance (Post-Pour) Passed appreoved

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
LE 2_2_74 SITE PLAN_V1.PDF DOCUMENTS VIEW