Permit Details

Status:
Complete
Type:
Fire Construction Permit
Address NEW:
1050 N MOUNTAIN AV
Apply Date:
06/25/2026
Applicant:
Bosch Building Technologies Office
Description:
PROVIDE AND INSTALL REQUIRED FIRE LIFE SAFETY DEVICES FOR THE CONTINUED PROTECTION AT KAPPA ALPHA THETA HOUSE PHASE 3. DEVICES LOCATED OUTSIDE THE SCOPE OF WORK ARE EXISTING AND TO REMAIN UNCHANGED.

Permit Reviews

Permit Number - TF-FCP-0626-00417
Permit Status: Complete
Permit Description: PROVIDE AND INSTALL REQUIRED FIRE LIFE SAFETY DEVICES FOR THE CONTINUED PROTECTION AT KAPPA ALPHA THETA HOUSE PHASE 3. DEVICES LOCATED OUTSIDE THE SCOPE OF WORK ARE EXISTING AND TO REMAIN UNCHANGED.
Start Date Submittal Complete Date Status  
06/25/2026 FIRE CONSTRUCTION REVIEW v.1 07/16/2026 REQUIRES RESUBMIT Review Details
07/16/2026 FIRE CONSTRUCTION REVIEW v.2 07/20/2026 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TF-FCP-0626-00417
Permit Description: PROVIDE AND INSTALL REQUIRED FIRE LIFE SAFETY DEVICES FOR THE CONTINUED PROTECTION AT KAPPA ALPHA THETA HOUSE PHASE 3. DEVICES LOCATED OUTSIDE THE SCOPE OF WORK ARE EXISTING AND TO REMAIN UNCHANGED.
Total Completed Inspections - 1
Date Description Inspector Results Comments
08/07/2026 COT - FCON - Alarm - Final Passed

Documents

File Name Document Type  
(REV1)KAPPA ALPHA THETA BETA DELTA PHASE 3 FA DRAWINGS_V1.PDF DOCUMENTS VIEW
(REV2)KAPPA ALPHA THETA BETA DELTA PHASE 3 FA DRAWINGS_V1.PDF DOCUMENTS VIEW
02426031 PHASE 3 KAPPA ALPHA THETA SUBMITTAL_V1.PDF DOCUMENTS VIEW