Permit Details

Status:
Complete
Type:
Fire Construction Permit
Apply Date:
04/15/2024
Applicant:
Hannah Pfleiderer
Description:
*DOUBLE EXPEDITE* - Addition of 6 new pendent sprinkler heads that are 155 degree. They are adding a hard lid ceiling that will cover the protection of the existing uprights.

Permit Reviews

Permit Number - TF-FCP-0424-00295
Permit Status: Complete
Permit Description: *DOUBLE EXPEDITE* - Addition of 6 new pendent sprinkler heads that are 155 degree. They are adding a hard lid ceiling that will cover the protection of the existing uprights.
Start Date Submittal Complete Date Status  
04/17/2024 FIRE CONSTRUCTION REVIEW v.1 04/17/2024 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TF-FCP-0424-00295
Permite Description: *DOUBLE EXPEDITE* - Addition of 6 new pendent sprinkler heads that are 155 degree. They are adding a hard lid ceiling that will cover the protection of the existing uprights.
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/30/2024 COT - FCON - Sprinkler - Final N/A Partial Pass Painted head shall be replaced, missing ceiling tile in office shall be replaced, a sprinkler head shall be added to walking in freezer.

Completed Inspections

Permit Status: Complete
Permit Number: TF-FCP-0424-00295
Permit Description: *DOUBLE EXPEDITE* - Addition of 6 new pendent sprinkler heads that are 155 degree. They are adding a hard lid ceiling that will cover the protection of the existing uprights.
Total Completed Inspections - 1
Date Description Inspector Results Comments
06/20/2024 COT - FCON - Sprinkler - Final Passed

Documents

File Name Document Type  
MZ3379 - ZIGGYS BAR- AS23_V1.0_V1.PDF DOCUMENTS VIEW