Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TE-FPU-0725-00264
Permit Details
Apply Date:
07/03/2025
Applicant:
Kelly Rehm
Description:
Void - not in a floodplain/FPU not needed. The MARQUEE ON 5TH photovoltaic system will consist of 354 SILFAB 530W modules. Grid-tied microinverters (106) will supply power through existing TEP service. Modules will be mounted across six roofs at a tilts of 15° and 12°, az=180°, using standoffs.
Permit Reviews
Permit Number - TE-FPU-0725-00264
Permit Status: Needs resubmittal
Permit Description: Void - not in a floodplain/FPU not needed. The MARQUEE ON 5TH photovoltaic system will consist of 354 SILFAB 530W modules. Grid-tied microinverters (106) will supply power through existing TEP service. Modules will be mounted across six roofs at a tilts of 15° and 12°, az=180°, using standoffs.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/03/2025 | FLOODPLAIN USE REVIEW v.1 | 07/15/2025 | REQUIRES RESUBMIT |