Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TE-FPU-0424-00108
Permit Details
Apply Date:
04/11/2024
Applicant:
ANGEL MORALES
Description:
Permit needed to discharge to storm drain southeast corner of Broadway and Randolph. Map attached Updated - 7.17.2024 Request for 30 day Extension as of 7/20/2024 on FUP permit only.
Permit Reviews
Permit Number - TE-FPU-0424-00108
Permit Status: Issued
Permit Description: Permit needed to discharge to storm drain southeast corner of Broadway and Randolph. Map attached
Updated - 7.17.2024
Request for 30 day Extension as of 7/20/2024 on FUP permit only.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/17/2024 | FLOODPLAIN USE REVIEW v.1 | 05/13/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TE-FPU-0424-00108
Permit Status: Issued
Permit Description: Permit needed to discharge to storm drain southeast corner of Broadway and Randolph. Map attached
Updated - 7.17.2024
Request for 30 day Extension as of 7/20/2024 on FUP permit only.
Total Outstanding Activity Conditions - 1
Date | Name |
---|---|
05/13/2024 | 1) Contractors will remove the equipment used for rig development during the week of May 27-June 1, 2024 and install a pump to complete temporary development and perform the 24-hour pump test and new source sampling the week of June 3 or the week of June 10, 2024. All temporary infrastructure and equipment shall be removed by June 17, 2024. 2) Temporary pipe conveying water to the storm drain will not exceed 10-inch. Maximum flowrate shall not exceed 2 cfs. 3) A temporary 12-foot pedestrian walk-over bridge shall be provided to facilitate wheelchairs and scooters on the path. Temporary pedestrian bridge shall be removed when not in use. 4) Permit expiration date: June 21, 2024. 5) If a permit extension is needed (due to breakdowns in contractor equipment or other delays), please contact DTM Engineering Division staff to review proposed new expiration date to consider extending permit expiration date. |