Permit: TD-DEV-1222-00088
Permit Details
Apply Date:
12/22/2022
Applicant:
Description:
New two-unit building addition.
Permit Reviews
Permit Number - TD-DEV-1222-00088
Permit Status: Issued
Permit Description: New two-unit building addition.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
07/27/2023 | DEVELOPMENT PACKAGE REVIEW v.4 | 11/27/2023 | APPROVED |
12/27/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 02/01/2023 | REQUIRES RESUBMIT |
03/15/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 05/01/2023 | REQUIRES RESUBMIT |
05/18/2023 | DEVELOPMENT PACKAGE REVIEW v.3 | 07/24/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Issued
Permit Number: TD-DEV-1222-00088
Permite Description: New two-unit building addition.
Total Outstanding Inspections - 8
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/09/2024 | City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection | N/A | Not Applicable | Contact your engineer regarding the roof drainage, and what is a reasonable solution for the site for all water drains directly onto the new sidewalks. This is against code, and will need to be rectified before we can perform the final inspection. Gutters may be need to be added to the north east and west side of the property to handle all roof drainage from this site. |
SITE - Stormwater Final Inspection | N/A | Requested | ||
COT - ENGR - Site - Assurance Release | N/A | Requested | ||
COT - ENGR - Stormwater | N/A | Requested | ||
COT - SITE - Zoning Intermediate | N/A | Requested | ||
SITE - Stormwater Follow-up | N/A | Requested | ||
SITE - Stormwater Setup and Controls | N/A | Requested | ||
SITE - Zoning Compliance | N/A | Requested |
Completed Inspections
Permit Status: Issued
Permit Number: TD-DEV-1222-00088
Permit Description: New two-unit building addition.
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/09/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
09/26/2024 | SITE | Passed | ||
09/26/2024 | COT - ENGR - Signage Final | Passed | ||
09/26/2024 | ENGR Engineering Final | Passed | ||
09/26/2024 | Final inspection to ensure all landscape and water harvesting SITE | Passed | ||
09/26/2024 | SITE - Zoning Final | Passed | ||
09/26/2024 | ENGR - Drainage Structures | Passed | ||
09/26/2024 | PDSD Site/Engineering Division - Landscaping | Passed | ||
09/26/2024 | PDSD Site/Engineering Division - NPPO | Passed |