Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TD-DEV-1222-00063
Permit Details
Apply Date:
12/06/2022
Applicant:
David Wood
Description:
Improvements to existing pool area at existing apartment building
Permit Reviews
Permit Number - TD-DEV-1222-00063
Permit Status: Issued
Permit Description: Improvements to existing pool area at existing apartment building
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/28/2023 | DEVELOPMENT PACKAGE REVIEW v.3 | 03/28/2023 | APPROVED |
01/23/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 02/22/2023 | REQUIRES RESUBMIT |
12/14/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 12/22/2022 | REQUIRES RESUBMIT |
Completed Inspections
Permit Status: Issued
Permit Number: TD-DEV-1222-00063
Permit Description: Improvements to existing pool area at existing apartment building
Total Completed Inspections - 17
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/06/2023 | ENGR - Drainage Structures | Passed | ||
12/06/2023 | SITE - SWPPP Correction Notice | Passed | ||
12/06/2023 | SITE - Stormwater Follow-up | Passed | ||
12/06/2023 | SITE - Stormwater Setup and Controls | Passed | ||
12/06/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
12/14/2023 | PDSD Site/Engineering Division - Landscaping | Passed | ||
12/14/2023 | Final inspection to ensure all landscape and water harvesting SITE | Passed | ||
12/14/2023 | SITE - Zoning Final | Passed | ||
12/14/2023 | SITE | Passed | ||
12/14/2023 | PDSD Site/Engineering Division - NPPO | Passed | ||
12/14/2023 | SITE - Stormwater Final Inspection | Passed | ||
12/14/2023 | City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection | Passed | ||
12/14/2023 | COT - ENGR - Stormwater | Passed | ||
12/14/2023 | COT - ENGR - Signage Final | Passed | ||
03/19/2024 | ENGR Engineering Final | Passed | ||
03/19/2024 | NPPO Pre-Construction | Passed | ||
03/19/2024 | ENGR Grading Final | Passed |