Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
1125 E FORT LOWELL RD
Apply Date:
11/22/2023
Applicant:
April Denman
Description:
Revision 1 started 09.26.2025 - 2 as-built units, one site plan for 2 parcels ** 6 Unit Residential Development

Permit Reviews

Permit Number - TD-DEV-1123-00465
Permit Status: Complete
Permit Description: Revision 1 started 09.26.2025 - 2 as-built units, one site plan for 2 parcels ** 6 Unit Residential Development
Start Date Submittal Complete Date Status  
09/10/2024 DEVELOPMENT PACKAGE NEW v.5 10/15/2024 APPROVED Review Details
11/24/2023 DEVELOPMENT PACKAGE NEW v.1 11/30/2023 REQUIRES RESUBMIT Review Details
10/29/2025 DEVELOPMENT PACKAGE NEW REVISION v.2 10/30/2025 APPROVED Review Details
05/02/2024 DEVELOPMENT PACKAGE NEW v.3 05/31/2024 REQUIRES RESUBMIT Review Details
02/29/2024 DEVELOPMENT PACKAGE NEW v.2 04/15/2024 REQUIRES RESUBMIT Review Details
09/26/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 10/28/2025 REQUIRES RESUBMIT Review Details
06/21/2024 DEVELOPMENT PACKAGE NEW v.4 08/23/2024 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TD-DEV-1123-00465
Permit Status: Complete
Permit Description: Revision 1 started 09.26.2025 - 2 as-built units, one site plan for 2 parcels ** 6 Unit Residential Development
Total Outstanding Activity Conditions - 1
Date Name
10/02/2025 CRWHPLAN NEEDS TO BE CREATED PRIOR TO CLOSEOUT

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-1123-00465
Permit Description: Revision 1 started 09.26.2025 - 2 as-built units, one site plan for 2 parcels ** 6 Unit Residential Development
Total Completed Inspections - 10
Date Description Inspector Results Comments
07/31/2025 ENGR Paving Passed Slopes are within tolerance, poured concrete in place of asphalt. Finished product is acceptable to city specifications. Drainage was altered and will be addressed in a revision.
07/31/2025 Passed Sidewalks and flatwork throughout the development are within requirements and specifications. Finished product design is acceptable and will be captured on a revision document.
07/31/2025 Passed Slopes and elevation changes were maintained as to not require any handrails.
07/31/2025 SITE - Zoning Final Passed Site is within the scope of the original DP.
07/31/2025 Passed Site striping, ADA parking, pedestrian access, bike parking and EV charging items are complete.
07/31/2025 LAND Landscape Appearance & Function Final Passed 7/31/25 - Finished landscaping is good and meets requirements.
07/31/2025 COT - ENGR - Signage Final Passed All signage on site is installed properly.
11/04/2025 ENGR Engineering Final Passed Revised plans/as-built reflects site conditions. Engineering is okay for CofO.
11/04/2025 Final inspection to ensure all landscape and water harvesting SITE Passed Water harvesting areas match revised plans/as-built.
11/04/2025 ENGR Grading Final Passed Drainage matches revised plans/as-built.

Documents

File Name Document Type  
1_ALUMNI FORT LOWELL DRANAGE REPORT AMENDMENT1_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
REVISION 1 - APPROVED - 1_ALUMNI FORT LOWELL DP AMENDMENT1_V1_V2 - STAMPED 10.30.2025.PDF DOCUMENTS VIEW
1_ALUMNI FORT LOWELL DRANAGE REPORT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
3_ALUMNI FORT LOWELL DPP_V4.PDF DOCUMENTS VIEW
RESPONSE LETTER.PDF DOCUMENTS VIEW