Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
11/17/2022
Applicant:
Lisa Bowers
Description:
New coffee shop with drive thru

Permit Reviews

Permit Number - TD-DEV-1122-00045
Permit Status: Complete
Permit Description: New coffee shop with drive thru
Start Date Submittal Complete Date Status  
01/19/2023 DEVELOPMENT PACKAGE REVIEW v.2 02/17/2023 APPROVED Review Details
12/01/2022 DEVELOPMENT PACKAGE REVIEW v.1 01/05/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-1122-00045
Permite Description: New coffee shop with drive thru
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
09/26/2023 COT - ENGR - Site - Assurance Release N/A Partial Pass Will recall inspection when all site work is completed.
09/26/2023 City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection N/A Partial Pass Will recall when when fewer vehicles are in parking lot.
09/26/2023 ENGR Engineering Final N/A Partial Pass Will recall inspection when all site work inspection items are completed and all vehicles and debris are removed from parking lot areas.
09/26/2023 SITE - Stormwater Final Inspection N/A Complete (Recurring)
09/26/2023 PDSD Site/Engineering Division - Landscaping N/A Partial Pass Will recall inspection when all landscape rock, replacement trees, and filter fabric under rip rap areas are completed.
03/07/2023 SITE - Zoning Final N/A Complete (Recurring) No activity at this time Contractor called me back for a pre-con inform the Contractor needs to call in every two weeks for inspections

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-1122-00045
Permit Description: New coffee shop with drive thru
Total Completed Inspections - 16
Date Description Inspector Results Comments
04/21/2023 PDSD Engineering Division Pre-Construction SITE Passed MAT WITH THE CREWS TO SEE WHAT THEIR SCHEDULE IS FOR THIS SITE. THE HAVE BEEN ON-SITE, HAVE THE BUILDING SLAB POURED, AND HAVE FRAMED MOST OF THE BUILDING IN STEEL STUDS. ALSO I LOOKED AT THE FOOTER FOR THE TRASH ENCLOSURE TO VERIFY THAT IT IS DONE PER OUR STANDARDS.
09/26/2023 COT - SITE - Zoning Intermediate Passed
12/18/2023 NPPO Pre-Construction Passed
09/28/2023 COT - ENGR - Site - Assurance Release Passed
09/28/2023 City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection Passed
09/28/2023 ENGR - Drainage Structures Passed
10/04/2023 ENGR Engineering Final Passed
10/04/2023 ENGR Grading Final Passed
10/04/2023 Verify required native plant protection, relocation, removal is completed prior to activity on job site Passed
10/04/2023 SITE - Stormwater Final Inspection Passed
11/03/2023 PDSD Site/Engineering Division - Landscaping Passed
11/03/2023 PDSD Site/Engineering Division - NPPO Passed
11/03/2023 COT - ENGR - Signage Final Passed
11/03/2023 COT - ENGR - Stormwater Passed
11/03/2023 SITE - Zoning Final Passed
11/03/2023 Final inspection to ensure all landscape and water harvesting SITE Passed

Documents

File Name Document Type  
1_APPLICATION_SIGNED_V1.PDF DOCUMENTS VIEW
1_DRAINAGE STATEMENT - 2022- 11- 17_V1.PDF DOCUMENTS VIEW
1_TYPE II CAPACITY RESPONSE_V1.PDF DOCUMENTS VIEW
2_CIVIL RESPONSE LETTER - DP - 1ST SUBMITTAL - 2023-01-13_V1.PDF DOCUMENTS VIEW
2_PLAN SET 2023-01-18_V2.PDF DOCUMENTS VIEW
2_STARBUCKS KINO GATEWAY - DP - PMOC - APPROVED_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_SIGNED_V1.PDF DOCUMENTS VIEW
1_DRAINAGE STATEMENT - 2022- 11- 17_V1.PDF DOCUMENTS VIEW
1_PLAN SET - 2022-11-17_V1.PDF DOCUMENTS VIEW
1_TYPE II CAPACITY RESPONSE_V1.PDF DOCUMENTS VIEW