Permit: TD-DEV-1122-00034
Permit Details
Apply Date:
11/11/2022
Applicant:
Logan Weitzel
Description:
Reconfiguration of existing drive-thru and new trash enclosure
Permit Reviews
Permit Number - TD-DEV-1122-00034
Permit Status: Complete
Permit Description: Reconfiguration of existing drive-thru and new trash enclosure
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/15/2022 | DEVELOPMENT PACKAGE REVIEW v.1 | 12/28/2022 | REQUIRES RESUBMIT |
02/15/2023 | DEVELOPMENT PACKAGE REVIEW v.3 | 03/02/2023 | APPROVED |
01/18/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 02/08/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-1122-00034
Permite Description: Reconfiguration of existing drive-thru and new trash enclosure
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/05/2023 | COT - SITE - Zoning Intermediate | N/A | Complete (Recurring) | Stormwater control inspection every two weeks no concerns at this time |
04/11/2023 | PDSD Engineering Division Pre-Construction SITE | N/A | Complete (Recurring) | Inform the contractor to call in inspections every two weeks. I gave the contractor a detail plan for the trash enclosures |
05/03/2023 | ENGR - Drainage Structures | N/A | Complete (Recurring) | Contractors and selling the steel for the footer for trash enclosures using number five bar. Gave a contractor another detail sheep because he lost his first one for the trash enclosure |
09/29/2023 | ENGR Grading Final | N/A | Partial Pass | handicap parking space in the northeast corner of the building needs to be removed stripping needs to be done as per the pedestrian cross walk. |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-1122-00034
Permit Description: Reconfiguration of existing drive-thru and new trash enclosure
Total Completed Inspections - 10
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/16/2023 | Final inspection to ensure all landscape and water harvesting SITE | Passed | ||
08/29/2023 | ENGR Engineering Final | Passed | ||
08/29/2023 | SITE - Stormwater Final Inspection | Passed | ||
08/29/2023 | SITE - Zoning Final | Passed | ||
09/20/2023 | COT - SITE - Zoning Intermediate | Passed | ||
09/21/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
09/21/2023 | PDSD Site/Engineering Division - Landscaping | Passed | All final inspection approved by John | |
09/21/2023 | ENGR - Drainage Structures | Passed | Final inspections approved by John Pagano, 9 20, 2023 | |
09/21/2023 | COT - ENGR - Stormwater | Passed | ||
10/03/2023 | ENGR Grading Final | Passed |