Permit: TD-DEV-1024-00293
Permit Details
Apply Date:
10/24/2024
Applicant:
ARC Studios
Description:
Revision 1-Restricted Record - Accessible parking & landscape at existing COT Park
Permit Reviews
Permit Number - TD-DEV-1024-00293
Permit Status: Complete
Permit Description: Revision 1-Restricted Record - Accessible parking & landscape at existing COT Park
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/31/2024 | DEVELOPMENT PACKAGE NEW v.1 | 11/07/2024 | REQUIRES RESUBMIT |
| 11/08/2024 | DEVELOPMENT PACKAGE NEW v.2 | 12/19/2024 | APPROVED |
| 02/21/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 03/24/2025 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-1024-00293
Permite Description: Revision 1-Restricted Record - Accessible parking & landscape at existing COT Park
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2025 | LAND Landscape Appearance & Function Final | N/A | Partial Pass | This will be a partial pass until all hydro seed has been completed in the landscape areas. |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-1024-00293
Permit Description: Revision 1-Restricted Record - Accessible parking & landscape at existing COT Park
Total Completed Inspections - 6
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/10/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | RFI is being worked on to show all grade and sidewalk elevations, a possible revision might be needed. | |
| 04/04/2025 | Consultation SITE | Passed | Check details in checklist items. Irrigation Mainline pressure test held 150 psi for 2 hrs. |
|
| 07/18/2025 | COT - ENGR - Signage Final | Passed | the only songs are the ADA signs, all are installed. They will add one van accessible to the sign on the west side parking. | |
| 07/18/2025 | ENGR Engineering Final | Passed | No issues, everything has been completed per plan and all elevations are correct. Sidewalks have been installed and have the correct slopes. | |
| 07/18/2025 | Passed | See attached notes | ||
| 07/18/2025 | ENGR Paving | Passed | Patchwork only has been done. One island removed was turned into a parking space and completed correctly 8' x 15' |