Permit: TD-DEV-0924-00245
Permit Details
Status:
Inspections
Type:
Development Package
Address:
8300 E VALENCIA RD
Address NEW:
8300 E VALENCIA RD
Apply Date:
09/03/2024
Applicant:
Chris Guinter
Description:
Revision 1 - Submitted 10.09.25 corrections, water update; New buildingS with parking and landscaping improvements
Permit Reviews
Permit Number - TD-DEV-0924-00245
Permit Status: Inspections
Permit Description: Revision 1 - Submitted 10.09.25 corrections, water update; New buildingS with parking and landscaping improvements
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/09/2024 | DEVELOPMENT PACKAGE NEW v.1 | 10/14/2024 | REQUIRES RESUBMIT |
| 12/09/2024 | DEVELOPMENT PACKAGE NEW v.2 | 01/30/2025 | REQUIRES RESUBMIT |
| 01/30/2025 | DEVELOPMENT PACKAGE NEW v.3 | 01/31/2025 | APPROVED |
| 10/09/2025 | DEVELOPMENT PACKAGE NEW REVISION v.1 | 11/05/2025 | REQUIRES RESUBMIT |
| 11/06/2025 | DEVELOPMENT PACKAGE NEW REVISION v.2 | 11/07/2025 | APPROVED |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0924-00245
Permit Description: Revision 1 - Submitted 10.09.25 corrections, water update; New buildingS with parking and landscaping improvements
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2025 | NPPO Pre-Construction | Passed | from the contractor that we needed to have all the test results all the material that has been used on site had to call him every two weeks for the sweep inspection | |
| 11/20/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | inform the contractor, we need to have all material, tested and call for swapp inspection every two weeks |