Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TD-DEV-0923-00403
Permit Details
Apply Date:
09/22/2023
Applicant:
Scott Martinez
Description:
Restricted Access - *Revision #1 started 4/1/24 (landscaping)* Replacement of the existing tennis courts and basketball court with (2) new covered basketball courts and (6) new pickleball courts.
Permit Reviews
Permit Number - TD-DEV-0923-00403
Permit Status: Inspections
Permit Description: Restricted Access - *Revision #1 started 4/1/24 (landscaping)* Replacement of the existing tennis courts and basketball court with (2) new covered basketball courts and (6) new pickleball courts.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/25/2023 | DEVELOPMENT PACKAGE NEW v.1 | 09/28/2023 | REQUIRES RESUBMIT |
10/25/2023 | DEVELOPMENT PACKAGE NEW v.2 | 11/17/2023 | REQUIRES RESUBMIT |
04/01/2024 | DEVELOPMENT PACKAGE NEW v.1 | 04/25/2024 | APPROVED |
11/28/2023 | DEVELOPMENT PACKAGE NEW v.3 | 12/11/2023 | APPROVED |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0923-00403
Permite Description: Restricted Access - *Revision #1 started 4/1/24 (landscaping)* Replacement of the existing tennis courts and basketball court with (2) new covered basketball courts and (6) new pickleball courts.
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/07/2024 | SITE - Stormwater Follow-up | N/A | Complete (Recurring) | |
11/07/2024 | COT - ENGR - Stormwater | N/A | Canceled |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0923-00403
Permit Description: Restricted Access - *Revision #1 started 4/1/24 (landscaping)* Replacement of the existing tennis courts and basketball court with (2) new covered basketball courts and (6) new pickleball courts.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/31/2024 | NPPO Pre-Construction | Passed | I had a conversation with the contractor about moving the entrance gate that’s across the street from the school. Informed him he needed to move it to the east side of the park so there’s no hazard to the children walking into the school area. | |
11/07/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | Joe Barr is the city PM on this job and should had scheduled the pre-con before this job started. | |
11/07/2024 | SITE - Stormwater Setup and Controls | Passed |