Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Development Package
Address:
425 S MANN AV
Address NEW:
425 S MANN AV
Apply Date:
09/22/2023
Applicant:
Amy Peron
Description:
Restricted Access - *Revision # 2 started 4/1/24 (landscaping)* Replacement of the existing tennis courts and basketball court with (2) new covered basketball courts and (6) new pickleball courts.

Permit Reviews

Permit Number - TD-DEV-0923-00403
Permit Status: Issued
Permit Description: Restricted Access - *Revision # 2 started 4/1/24 (landscaping)* Replacement of the existing tennis courts and basketball court with (2) new covered basketball courts and (6) new pickleball courts.
Start Date Submittal Complete Date Status  
08/29/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 10/06/2025 APPROVED Review Details
09/25/2023 DEVELOPMENT PACKAGE NEW v.1 09/28/2023 REQUIRES RESUBMIT Review Details
10/25/2023 DEVELOPMENT PACKAGE NEW v.2 11/17/2023 REQUIRES RESUBMIT Review Details
04/01/2024 DEVELOPMENT PACKAGE NEW v.1 04/25/2024 APPROVED Review Details
11/28/2023 DEVELOPMENT PACKAGE NEW v.3 12/11/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: TD-DEV-0923-00403
Permite Description: Restricted Access - *Revision # 2 started 4/1/24 (landscaping)* Replacement of the existing tennis courts and basketball court with (2) new covered basketball courts and (6) new pickleball courts.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
12/31/2024 COT - ENGR - Stormwater N/A Complete (Recurring) All items have been corrected that were listed, these areas need to be maintained as the project moves forward.
04/25/2025 SITE - Stormwater Follow-up N/A Complete (Recurring) Swppp is good, ok to schedule at 4 weeks until we see a rain event.
04/28/2025 SITE - Stormwater Final Inspection N/A Partial Pass contractor needs complete the project before I finalize the stormwater
11/05/2025 ENGR Engineering Final N/A Partial Pass Revision required to reflect as-built status.

Completed Inspections

Permit Status: Issued
Permit Number: TD-DEV-0923-00403
Permit Description: Restricted Access - *Revision # 2 started 4/1/24 (landscaping)* Replacement of the existing tennis courts and basketball court with (2) new covered basketball courts and (6) new pickleball courts.
Total Completed Inspections - 7
Date Description Inspector Results Comments
10/31/2024 NPPO Pre-Construction Passed I had a conversation with the contractor about moving the entrance gate that’s across the street from the school. Informed him he needed to move it to the east side of the park so there’s no hazard to the children walking into the school area.
11/07/2024 PDSD Engineering Division Pre-Construction SITE Passed Joe Barr is the city PM on this job and should had scheduled the pre-con before this job started.
11/07/2024 SITE - Stormwater Setup and Controls Passed
04/24/2025 COT - SITE - Zoning Intermediate Passed inform the contractor needed to clean out all the trenches before backfilling and before put it in the top layer, bedding sand
04/24/2025 SITE - Zoning Compliance Passed inform the contractor needed to clean out all the trenches before backfilling and before put it in the top layer, bedding sand
04/28/2025 Passed
04/28/2025 ENGR - Drainage Structures Passed

Documents

File Name Document Type  
PALO_VERDE-PLAYGROUND-RAMADA-100DP-250828_V1.PDF DOCUMENTS VIEW