Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Development Package
Address:
425 S MANN AV
Apply Date:
09/22/2023
Applicant:
Scott Martinez
Description:
Restricted Access - *Revision #1 started 4/1/24 (landscaping)* Replacement of the existing tennis courts and basketball court with (2) new covered basketball courts and (6) new pickleball courts.

Permit Reviews

Permit Number - TD-DEV-0923-00403
Permit Status: Inspections
Permit Description: Restricted Access - *Revision #1 started 4/1/24 (landscaping)* Replacement of the existing tennis courts and basketball court with (2) new covered basketball courts and (6) new pickleball courts.
Start Date Submittal Complete Date Status  
09/25/2023 DEVELOPMENT PACKAGE NEW v.1 09/28/2023 REQUIRES RESUBMIT Review Details
10/25/2023 DEVELOPMENT PACKAGE NEW v.2 11/17/2023 REQUIRES RESUBMIT Review Details
04/01/2024 DEVELOPMENT PACKAGE NEW v.1 04/25/2024 APPROVED Review Details
11/28/2023 DEVELOPMENT PACKAGE NEW v.3 12/11/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0923-00403
Permite Description: Restricted Access - *Revision #1 started 4/1/24 (landscaping)* Replacement of the existing tennis courts and basketball court with (2) new covered basketball courts and (6) new pickleball courts.
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
11/07/2024 SITE - Stormwater Follow-up N/A Complete (Recurring)
11/07/2024 COT - ENGR - Stormwater N/A Canceled

Completed Inspections

Permit Status: Inspections
Permit Number: TD-DEV-0923-00403
Permit Description: Restricted Access - *Revision #1 started 4/1/24 (landscaping)* Replacement of the existing tennis courts and basketball court with (2) new covered basketball courts and (6) new pickleball courts.
Total Completed Inspections - 3
Date Description Inspector Results Comments
10/31/2024 NPPO Pre-Construction Passed I had a conversation with the contractor about moving the entrance gate that’s across the street from the school. Informed him he needed to move it to the east side of the park so there’s no hazard to the children walking into the school area.
11/07/2024 PDSD Engineering Division Pre-Construction SITE Passed Joe Barr is the city PM on this job and should had scheduled the pre-con before this job started.
11/07/2024 SITE - Stormwater Setup and Controls Passed