Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
09/20/2023
Applicant:
Blake DeFevers
Description:
Amendment to approved DP14-0058 ( dp14-0058 has been closed out)

Permit Reviews

Permit Number - TD-DEV-0923-00399
Permit Status: Complete
Permit Description: Amendment to approved DP14-0058 ( dp14-0058 has been closed out)
Start Date Submittal Complete Date Status  
11/04/2023 DEVELOPMENT PACKAGE NEW v.2 11/14/2023 APPROVED Review Details
09/22/2023 DEVELOPMENT PACKAGE NEW v.1 10/30/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-0923-00399
Permite Description: Amendment to approved DP14-0058 ( dp14-0058 has been closed out)
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
04/19/2024 COT - ENGR - Stormwater N/A Partial Pass TEP facility, building construction in progress. Stormwater controls installed please schedule preconstruction meeting.
05/30/2024 ENGR - Drainage Structures N/A Not Applicable
06/10/2024 NPPO Pre-Construction N/A Canceled
05/30/2024 PDSD Site/Engineering Division - Landscaping N/A Not Applicable
05/30/2024 PDSD Site/Engineering Division - NPPO N/A Not Applicable No native plants shown on plan
06/10/2024 SITE N/A Canceled
12/09/2024 ENGR Engineering Final N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0923-00399
Permit Description: Amendment to approved DP14-0058 ( dp14-0058 has been closed out)
Total Completed Inspections - 2
Date Description Inspector Results Comments
03/28/2024 Verify required native plant protection, relocation, removal is completed prior to activity on job site Passed
06/14/2024 PDSD Engineering Division Pre-Construction SITE Passed Shade Canopy installation. Building will inspect structure per COM permit. Site Engineering will conduct Final inspection for DP when complete.

Documents

File Name Document Type  
APPROVED_2_APPROVED BY PCWW PLANS_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW