Permit: TD-DEV-0825-00205
Permit Details
Apply Date:
08/05/2025
Applicant:
bill mackey
Description:
New Building, parking and chain link fence
Permit Reviews
Permit Number - TD-DEV-0825-00205
Permit Status: Inspections
Permit Description: New Building, parking and chain link fence
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/22/2026 | DEVELOPMENT PACKAGE NEW v.4 | 02/13/2026 | APPROVED |
| 08/08/2025 | DEVELOPMENT PACKAGE NEW v.2 | 10/17/2025 | REQUIRES RESUBMIT |
| 10/24/2025 | DEVELOPMENT PACKAGE NEW v.3 | 11/18/2025 | REQUIRES RESUBMIT |
| 08/05/2025 | DEVELOPMENT PACKAGE NEW v.1 | 08/07/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TD-DEV-0825-00205
Permit Status: Inspections
Permit Description: New Building, parking and chain link fence
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 11/06/2025 | This project requires a Right-of-Way (ROW) permit issued by Department of Transportation and Mobility (DTM) prior to working in the public Right-of-Way. |
Completed Inspections
Permit Status: Inspections
Permit Number: TD-DEV-0825-00205
Permit Description: New Building, parking and chain link fence
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/20/2026 | PDSD Engineering Division Pre-Construction SITE | Passed | Meeting held on site. For the development package inspections should be called for the concrete V-ditch in the driveway, the water retention basin on the south side, paving sub-grade and AB. |