Permit: TD-DEV-0823-00342
Permit Details
Status:
Complete
Type:
Development Package
Address:
3101 E SPEEDWAY BL
Address NEW:
3101 E SPEEDWAY BL
Apply Date:
08/02/2023
Applicant:
Alexander Silvers
Description:
*Revision #1 started 2/27/24* Minor development of existing Mister Car Wash site
Permit Reviews
Permit Number - TD-DEV-0823-00342
Permit Status: Complete
Permit Description: *Revision #1 started 2/27/24* Minor development of existing Mister Car Wash site
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/10/2023 | DEVELOPMENT PACKAGE NEW v.2 | 11/09/2023 | REQUIRES RESUBMIT |
| 08/03/2023 | DEVELOPMENT PACKAGE NEW v.1 | 09/22/2023 | REQUIRES RESUBMIT |
| 11/14/2023 | DEVELOPMENT PACKAGE NEW v.3 | 02/09/2024 | APPROVED |
| 02/27/2024 | DEVELOPMENT PACKAGE NEW v.1 | 04/18/2024 | REQUIRES RESUBMIT |
| 04/30/2024 | DEVELOPMENT PACKAGE NEW v.2 | 05/16/2024 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0823-00342
Permite Description: *Revision #1 started 2/27/24* Minor development of existing Mister Car Wash site
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/05/2024 | Grading Progress ENGR | N/A | Partial Pass | Contractor needs to remove all the excess concrete that they poured onto the ground with no plastic underneath it |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0823-00342
Permit Description: *Revision #1 started 2/27/24* Minor development of existing Mister Car Wash site
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/11/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | ||
| 07/29/2025 | Consultation SITE | Passed | Site is very close to getting closed out. My guess would be middle to end of August with the amount of work needed to be finished. Landscaping and water harvesting can be called now. Building sign inspections and monument sign. All grading inspections. All flat work inspections. |
|
| 08/05/2025 | ENGR Grading Final | Passed | Contractor needs to finish the landscaping and remove all construction equipment and materials from site dumpsters porta potties finish the veneer on the front wall some patching on concrete in the front | |
| 08/05/2025 | SITE - Zoning Final | Passed | ||
| 08/21/2025 | ENGR Engineering Final | Passed |