Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
07/29/2025
Applicant:
alex enoch
Description:
new detached adu

Permit Reviews

Permit Number - TD-DEV-0725-00198
Permit Status: Complete
Permit Description: new detached adu
Start Date Submittal Complete Date Status  
08/07/2025 DEVELOPMENT PACKAGE NEW v.2 08/08/2025 REQUIRES RESUBMIT Review Details
07/30/2025 DEVELOPMENT PACKAGE NEW v.1 08/01/2025 REQUIRES RESUBMIT Review Details
08/12/2025 DEVELOPMENT PACKAGE NEW v.3 09/08/2025 REQUIRES RESUBMIT Review Details
09/22/2025 DEVELOPMENT PACKAGE NEW v.4 09/24/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-0725-00198
Permite Description: new detached adu
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/24/2026 ENGR Engineering Final N/A Partial Pass contractor needs to address the riprap area in the back of the house and in front of the house at the front door

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0725-00198
Permit Description: new detached adu
Total Completed Inspections - 4
Date Description Inspector Results Comments
10/13/2025 PDSD Engineering Division Pre-Construction SITE Passed I informed the contractor he can proceed with construction. Also informed him we needed all the test, compact, asphalt, concrete, etc. must be on site at all times and have a hard copy of all the test.
04/14/2026 SITE - Zoning Final Passed
02/26/2026 Passed
02/26/2026 ENGR Engineering Final Passed

Documents

File Name Document Type  
APPROVED - DP V4_V4 - STAMPED 09.24.2025.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW