Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Development Package
Address:
3301 E GLOBAL LP
Address NEW:
3301 E GLOBAL LP
Apply Date:
07/11/2024
Applicant:
James Lynch
Description:
Rev 2 - new ramp, roof enclosure started 03.11.2026 ** Revision 1 - THE SCOPE OF WORK FOR THIS PROJECT INCLUDES REMOVAL OF TEN (10) EXISTING PARKING SPACES TO MAKE WAY FOR A NEW "NORTH" OUTDOOR GENERATOR YARD. SITE DEMOLITION WORK TO INCLUDE REMOVAL OF EXISTING CONCRETE SLABS, CONCRETE CURBS, AND ASPHALT PAVEMENT AS REQUIRED TO INSTALL NEW ELECTRICAL EQUIPMENT.. NEW SITE WORK TO INCLUDE NEW CONCRETE SLABS FOR NEW ELECTRICAL EQUIPMENT, PATCHING OF EXISTING ASPHALT PAVEMENT, NEW STEEL FENCING AND NEW CHAIN LINK FENCING & GATES TO MATCH THE EXISTING CHAIN LINK FENCE SIZE, HEIGHTS AND CONFIGURATION. REFER TO SHEETS P100, E100 AND E400 FOR EXISTING ELECTRICAL DEMOLITION AND INSTALLATION OF NEW GENERATOR, NEW SERVICE ENTRACNCE SECTION (SES), AND ALL RELATED ELECTRICAL WORK ASSOCIATED WITH THE NEW NORTH GENERATOR YARD.

Permit Reviews

Permit Number - TD-DEV-0724-00206
Permit Status: Issued
Permit Description: Rev 2 - new ramp, roof enclosure started 03.11.2026 ** Revision 1 - THE SCOPE OF WORK FOR THIS PROJECT INCLUDES REMOVAL OF TEN (10) EXISTING PARKING SPACES TO MAKE WAY FOR A NEW "NORTH" OUTDOOR GENERATOR YARD. SITE DEMOLITION WORK TO INCLUDE REMOVAL OF EXISTING CONCRETE SLABS, CONCRETE CURBS, AND ASPHALT PAVEMENT AS REQUIRED TO INSTALL NEW ELECTRICAL EQUIPMENT.. NEW SITE WORK TO INCLUDE NEW CONCRETE SLABS FOR NEW ELECTRICAL EQUIPMENT, PATCHING OF EXISTING ASPHALT PAVEMENT, NEW STEEL FENCING AND NEW CHAIN LINK FENCING & GATES TO MATCH THE EXISTING CHAIN LINK FENCE SIZE, HEIGHTS AND CONFIGURATION. REFER TO SHEETS P100, E100 AND E400 FOR EXISTING ELECTRICAL DEMOLITION AND INSTALLATION OF NEW GENERATOR, NEW SERVICE ENTRACNCE SECTION (SES), AND ALL RELATED ELECTRICAL WORK ASSOCIATED WITH THE NEW NORTH GENERATOR YARD.
Start Date Submittal Complete Date Status  
03/11/2026 DEVELOPMENT PACKAGE NEW REVISION v.1 04/03/2026 REQUIRES RESUBMIT Review Details
07/12/2024 DEVELOPMENT PACKAGE NEW v.1 08/23/2024 REQUIRES RESUBMIT Review Details
01/30/2025 DEVELOPMENT PACKAGE NEW REVISION v.1 03/21/2025 APPROVED Review Details
09/10/2024 DEVELOPMENT PACKAGE NEW v.2 10/11/2024 APPROVED Review Details
04/03/2026 DEVELOPMENT PACKAGE NEW REVISION v.2 04/06/2026 APPROVED Review Details

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
REVISION 2 - APPROVED - REV2_2_DEVELOPMENT PACKAGE PLAN SET_V2 - STAMPED 04.06.2026.PDF DOCUMENTS VIEW
REVISION 2 NARRATIVE_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
REV2_DEVELOPMENT PACKAGE TD-DEV-0724-00206_V1.PDF DOCUMENTS VIEW