Permit Details

Status:
Complete
Type:
Development Package
Address:
200 E YAVAPAI RD
Address NEW:
200 E YAVAPAI RD
Apply Date:
06/12/2024
Applicant:
Daniel Small
Description:
We are adding a 14' x 24' high tunnel to the garden area of the parcel. The garden area is on the far East side of the parcel.

Permit Reviews

Permit Number - TD-DEV-0624-00175
Permit Status: Complete
Permit Description: We are adding a 14' x 24' high tunnel to the garden area of the parcel. The garden area is on the far East side of the parcel.
Start Date Submittal Complete Date Status  
03/26/2025 DEVELOPMENT PACKAGE NEW v.4 03/26/2025 REQUIRES RESUBMIT Review Details
11/22/2024 DEVELOPMENT PACKAGE NEW v.3 12/27/2024 REQUIRES RESUBMIT Review Details
06/20/2024 DEVELOPMENT PACKAGE NEW v.2 07/31/2024 REQUIRES RESUBMIT Review Details
06/14/2024 DEVELOPMENT PACKAGE NEW v.1 06/17/2024 REQUIRES RESUBMIT Review Details
03/28/2025 DEVELOPMENT PACKAGE NEW v.5 03/28/2025 REQUIRES RESUBMIT Review Details
04/02/2025 DEVELOPMENT PACKAGE NEW v.6 04/03/2025 APPROVED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0624-00175
Permit Description: We are adding a 14' x 24' high tunnel to the garden area of the parcel. The garden area is on the far East side of the parcel.
Total Completed Inspections - 3
Date Description Inspector Results Comments
04/11/2025 PDSD Engineering Division Pre-Construction SITE Passed 48’ setback is measured between hoop house edge to chain link fence to the south. This fence is beyond white wood fence on property.
01/30/2026 SITE - Zoning Final Passed Project is complete in accordance with approved plans.
02/13/2026 ENGR Engineering Final Passed Site is complete in accordance with approved plans.