Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address NEW:
1511 W VALENCIA RD
Apply Date:
06/01/2023
Applicant:
Brad Roman
Description:
Development package for automotive drive- thru oil change development

Permit Reviews

Permit Number - TD-DEV-0623-00260
Permit Status: Complete
Permit Description: Development package for automotive drive- thru oil change development
Start Date Submittal Complete Date Status  
06/01/2023 DEVELOPMENT PACKAGE NEW v.1 07/11/2023 REQUIRES RESUBMIT Review Details
07/25/2023 DEVELOPMENT PACKAGE NEW v.2 07/31/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-0623-00260
Permite Description: Development package for automotive drive- thru oil change development
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
07/27/2023 SITE - Stormwater Setup and Controls N/A Partial Pass Partial Pass for the Install of Controls at this time
04/23/2025 N/A Not Applicable Existing valley drain does not show up on plans. location is on the west side of Take 5 from the refuse enclosure to the north existing drainage basin. Elevations in the field do show constant drainage from south to north but a revision is needed on plans to show this.
04/24/2025 SITE - Stormwater Follow-up N/A Complete (Recurring) No issues

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0623-00260
Permit Description: Development package for automotive drive- thru oil change development
Total Completed Inspections - 14
Date Description Inspector Results Comments
12/30/2024 Consultation SITE Passed No general contractor on site, the block guys will give him my card. Travis with Pate is the supper.
01/06/2025 PDSD Engineering Division Pre-Construction SITE Passed
02/21/2025 For trash and recycling enclosures Passed Interior slab only, good to pour 02/21/25
05/07/2025 ENGR Paving Passed
05/07/2025 ENGR Grading Final Passed
05/07/2025 SITE - Zoning Final Passed
05/12/2025 ENGR Engineering Final Passed No issues, everything looks good.
05/12/2025 Final inspection to ensure all landscape and water harvesting SITE Passed
05/12/2025 LAND Landscape Appearance & Function Final Passed No issues, everything is to plan.
05/12/2025 Passed
05/12/2025 Passed
05/12/2025 Passed
05/12/2025 Passed All work meets or exceeds ADA standards
05/12/2025 Passed

Documents

File Name Document Type  
2B - 5126B_COMMENT RESPONSE LETTER_V1.PDF DOCUMENTS VIEW
2C - 5126B _DRAINAGE REPORT_V2.PDF DOCUMENTS VIEW
2D - 5126B_TP-MOD-0623-000015- DECISION LETTER PDP 07112023_V1.PDF DOCUMENTS VIEW
2E - 5126B_DP22-0116 SHEET C5.2_V1.PDF DOCUMENTS VIEW
APPROVED 2A - 5126B_DEVELOPMENT PACKAGE_V2 SIGNED 07.31.23.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
APPROVED DEVELOPMENT LETTER.PDF DOCUMENTS VIEW
TEP FACILITIES MAP.PDF DOCUMENTS VIEW