Permit: TD-DEV-0523-00240
Permit Details
Apply Date:
05/11/2023
Applicant:
Susan Carlson-Herdt
Description:
210.6 KW DC photovoltaic shade structure
Permit Reviews
Permit Number - TD-DEV-0523-00240
Permit Status: Complete
Permit Description: 210.6 KW DC photovoltaic shade structure
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
06/21/2023 | DEVELOPMENT PACKAGE NEW v.1 | 06/26/2023 | APPROVED |
05/12/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 06/26/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0523-00240
Permite Description: 210.6 KW DC photovoltaic shade structure
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/26/2024 | Verify required native plant protection, relocation, removal is completed prior to activity on job site | N/A | Not Ready |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0523-00240
Permit Description: 210.6 KW DC photovoltaic shade structure
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/19/2023 | PDSD Site/Engineering Division - Landscaping | Passed | Not applicable. | |
12/14/2023 | PDSD Engineering Division Pre-Construction SITE | Passed | Reviewed project with David Burleigh from Solon Corporation and walked site the (2) solar structures located in the Zoo parking lot on Zoo Court will be dismantled and moved to the corner of Zoo Court and Randolph way. A total of (5) Black Oak Acorn trees will be removed from the parking lot where the (2) solar structures will be reassembled. The (5) Black Oak Acorn trees are not required to be replaced. |
|
02/01/2024 | ENGR - Drainage Structures | Passed | ||
02/01/2024 | SITE | Passed | ||
02/01/2024 | COT - ENGR - Stormwater | Passed | ||
02/01/2024 | SITE - Zoning Compliance | Passed | ||
02/01/2024 | COT - SITE - Zoning Intermediate | Passed | ||
02/01/2024 | SITE - Stormwater Setup and Controls | Passed | ||
02/12/2024 | City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection | Passed | ||
02/12/2024 | COT - ENGR - Site - Assurance Release | Passed | ||
02/12/2024 | PDSD Site/Engineering Division - NPPO | Passed | ||
02/12/2024 | Final inspection to ensure all landscape and water harvesting SITE | Passed | ||
02/12/2024 | COT - ENGR - Signage Final | Passed | ||
02/12/2024 | SITE - Stormwater Final Inspection | Passed | ||
02/12/2024 | SITE - Zoning Final | Passed | ||
02/21/2024 | ENGR Engineering Final | Passed | ||
02/21/2024 | SITE - Stormwater Follow-up | Passed | ||
02/21/2024 | SITE - SWPPP Correction Notice | Passed | ||
02/21/2024 | SITE - SWPPP Violation Notice | Passed | ||
02/26/2024 | ENGR Grading Final | Passed |