Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
05/11/2023
Applicant:
Cary Broschat
Description:
210.6 KW DC photovoltaic shade structure

Permit Reviews

Permit Number - TD-DEV-0523-00240
Permit Status: Complete
Permit Description: 210.6 KW DC photovoltaic shade structure
Start Date Submittal Complete Date Status  
06/21/2023 DEVELOPMENT PACKAGE NEW v.1 06/26/2023 APPROVED Review Details
05/12/2023 DEVELOPMENT PACKAGE REVIEW v.1 06/26/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-0523-00240
Permite Description: 210.6 KW DC photovoltaic shade structure
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
02/26/2024 Verify required native plant protection, relocation, removal is completed prior to activity on job site N/A Not Ready

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0523-00240
Permit Description: 210.6 KW DC photovoltaic shade structure
Total Completed Inspections - 20
Date Description Inspector Results Comments
10/19/2023 PDSD Site/Engineering Division - Landscaping Passed Not applicable.
12/14/2023 PDSD Engineering Division Pre-Construction SITE Passed Reviewed project with David Burleigh from Solon Corporation and walked site the (2) solar structures located in the Zoo parking lot on Zoo Court will be dismantled and moved to the corner of Zoo Court and Randolph way.

A total of (5) Black Oak Acorn trees will be removed from the parking lot where the (2) solar structures will be reassembled.

The (5) Black Oak Acorn trees are not required to be replaced.
02/01/2024 ENGR - Drainage Structures Passed
02/01/2024 SITE Passed
02/01/2024 COT - ENGR - Stormwater Passed
02/01/2024 SITE - Zoning Compliance Passed
02/01/2024 COT - SITE - Zoning Intermediate Passed
02/01/2024 SITE - Stormwater Setup and Controls Passed
02/12/2024 City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection Passed
02/12/2024 COT - ENGR - Site - Assurance Release Passed
02/12/2024 PDSD Site/Engineering Division - NPPO Passed
02/12/2024 Final inspection to ensure all landscape and water harvesting SITE Passed
02/12/2024 COT - ENGR - Signage Final Passed
02/12/2024 SITE - Stormwater Final Inspection Passed
02/12/2024 SITE - Zoning Final Passed
02/21/2024 ENGR Engineering Final Passed
02/21/2024 SITE - Stormwater Follow-up Passed
02/21/2024 SITE - SWPPP Correction Notice Passed
02/21/2024 SITE - SWPPP Violation Notice Passed
02/26/2024 ENGR Grading Final Passed