Permit Details

Status:
Issued
Type:
Development Package
Address:
4350 E GRANT RD
Apply Date:
04/04/2023
Applicant:
Brian Pugh
Description:
Restricted Access - *Revision #2 (wall thickness) started 5/30/24* Proposed construction of a 12-foot security wall on the southern boundary of the Grant Substation. Requesting a variance from UDC Sections 6.6.2.I and 6.3-2.A

Permit Reviews

Permit Number - TD-DEV-0423-00199
Permit Status: Issued
Permit Description: Restricted Access - *Revision #2 (wall thickness) started 5/30/24* Proposed construction of a 12-foot security wall on the southern boundary of the Grant Substation. Requesting a variance from UDC Sections 6.6.2.I and 6.3-2.A
Start Date Submittal Complete Date Status  
08/22/2023 DEVELOPMENT PACKAGE REVIEW v.2 09/21/2023 REQUIRES RESUBMIT Review Details
10/27/2023 DEVELOPMENT PACKAGE NEW v.1 12/05/2023 REQUIRES RESUBMIT Review Details
01/16/2024 DEVELOPMENT PACKAGE NEW v.2 02/23/2024 APPROVED Review Details
03/27/2024 DEVELOPMENT PACKAGE REVIEW v.1 05/03/2024 APPROVED Review Details
05/30/2024 DEVELOPMENT PACKAGE NEW v.1 06/10/2024 REQUIRES RESUBMIT Review Details
07/30/2024 DEVELOPMENT PACKAGE NEW v.2 08/07/2024 REQUIRES RESUBMIT Review Details
08/08/2024 DEVELOPMENT PACKAGE NEW v.3 08/29/2024 APPROVED Review Details
04/04/2023 DEVELOPMENT PACKAGE REVIEW v.1 04/13/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: TD-DEV-0423-00199
Permite Description: Restricted Access - *Revision #2 (wall thickness) started 5/30/24* Proposed construction of a 12-foot security wall on the southern boundary of the Grant Substation. Requesting a variance from UDC Sections 6.6.2.I and 6.3-2.A
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
05/03/2024 ENGR - Drainage Structures N/A Not Ready Contractor has questions about his permit status. Status is in review at this time. Contact phone numbers provided.
PDSD Engineering Division Pre-Construction SITE N/A Not Ready DP in revision. Wil reschedule after approval.