Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TD-DEV-0325-00091
Permit Details
Status:
Issued
Type:
Development Package
Address:
4045 E BROADWAY BL
Address NEW:
4045 E BROADWAY BL
Apply Date:
03/21/2025
Applicant:
Kevin Paulus
Description:
This DDO request is to address an existing corrugated 6'-0" steel fence & 6'-6" rolling gate system added by the property owner sans permits in about 2022 to address a very serious & ongoing existing problem with homeless vagrants & accompanying theft & vandalism at the rear of this commercial building. In addition two 195 SF prefabricated wooden "Tuff Shed" storage buildings were inside the gated area for added furniture stock storage as this is a furniture store. The prefab storage sheds have the requisite setbacks with one requiring a setback variance based on the adjacent neighbor signing the site plan to approve a 7'-0" setback and the other storage shed with an 11'-9" maximum ridge height requiring a 10'-0" minimum setback with a 12'-0" setback provided.
Permit Reviews
Permit Number - TD-DEV-0325-00091
Permit Status: Issued
Permit Description: This DDO request is to address an existing corrugated 6'-0" steel fence & 6'-6" rolling gate system added by the property owner sans permits in about 2022 to address a very serious & ongoing existing problem with homeless vagrants & accompanying theft & vandalism at the rear of this commercial building. In addition two 195 SF prefabricated wooden "Tuff Shed" storage buildings were inside the gated area for added furniture stock storage as this is a furniture store. The prefab storage sheds have the requisite setbacks with one requiring a setback variance based on the adjacent neighbor signing the site plan to approve a 7'-0" setback and the other storage shed with an 11'-9" maximum ridge height requiring a 10'-0" minimum setback with a 12'-0" setback provided.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/02/2025 | DEVELOPMENT PACKAGE NEW v.2 | 07/01/2025 | REQUIRES RESUBMIT |
| 03/24/2025 | DEVELOPMENT PACKAGE NEW v.1 | 03/28/2025 | REQUIRES RESUBMIT |
| 07/23/2025 | DEVELOPMENT PACKAGE NEW v.3 | 07/25/2025 | APPROVED |