Permit: TD-DEV-0324-00066
Permit Details
Status:
Complete
Type:
Development Package
Address:
526 N WESTMORELAND AV
Address NEW:
526 N WESTMORELAND AV
Apply Date:
03/04/2024
Applicant:
Albert Hernandez
Description:
Development Package is for the review of a proposed 3 unit development project. This project will consist of two buildings, one consisting of 4 beds and 4 baths and the second building consisting of a duplex building with each unit consisting of 2 beds and 2 baths.
Permit Reviews
Permit Number - TD-DEV-0324-00066
Permit Status: Complete
Permit Description: Development Package is for the review of a proposed 3 unit development project. This project will consist of two buildings, one consisting of 4 beds and 4 baths and the second building consisting of a duplex building with each unit consisting of 2 beds and 2 baths.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/26/2024 | DEVELOPMENT PACKAGE NEW v.4 | 07/24/2024 | REQUIRES RESUBMIT |
| 05/08/2024 | DEVELOPMENT PACKAGE NEW v.3 | 06/08/2024 | REQUIRES RESUBMIT |
| 08/01/2024 | DEVELOPMENT PACKAGE NEW v.5 | 08/02/2024 | APPROVED |
| 03/19/2024 | DEVELOPMENT PACKAGE NEW v.2 | 04/19/2024 | REQUIRES RESUBMIT |
| 03/06/2024 | DEVELOPMENT PACKAGE NEW v.1 | 03/11/2024 | REQUIRES RESUBMIT |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0324-00066
Permit Description: Development Package is for the review of a proposed 3 unit development project. This project will consist of two buildings, one consisting of 4 beds and 4 baths and the second building consisting of a duplex building with each unit consisting of 2 beds and 2 baths.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/18/2025 | PDSD Engineering Division Pre-Construction SITE | Passed | Met on-site to discuss variations from approved plan set. Will discuss ROW improvements with DTM, and verify changes are acceptable to Zoning and drainage won’t affect any neighboring parcels. | |
| 04/04/2025 | ENGR Engineering Final | Passed | ||
| 04/04/2025 | SITE - Zoning Final | Passed |