Permit: TD-DEV-0323-00174
Permit Details
Apply Date:
03/17/2023
Applicant:
Paul O'Rourke
Description:
Paving/Grading plan for Phase 2 of Intermountain Academy located in Commerce Loop Park
Permit Reviews
Permit Number - TD-DEV-0323-00174
Permit Status: Issued
Permit Description: Paving/Grading plan for Phase 2 of Intermountain Academy located in Commerce Loop Park
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
04/18/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 07/19/2023 | APPROVED |
03/20/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 03/27/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Issued
Permit Number: TD-DEV-0323-00174
Permite Description: Paving/Grading plan for Phase 2 of Intermountain Academy located in Commerce Loop Park
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/19/2023 | PDSD Site/Engineering Division - Landscaping | N/A | Partial Pass | 12/19/23: footings for (3) garden planters per plan ok to pour, (4) footings for Ramada #2 per plan ok to pour, (4) footings for Ramada #1 per plan ok to pour. |
12/20/2023 | PDSD Engineering Division Pre-Construction SITE | N/A | Partial Pass | Charles at 576-2236. Provide Stormwater controls as needed. Contain all materials within job site. Schedule for site inspections. |
08/01/2023 | ENGR - Drainage Structures | N/A | Partial Pass | Ok to pour footer |
12/27/2023 | COT - ENGR - Stormwater | N/A | Partial Pass | Grading and concrete construction activities. Provide concrete containment as required. Remove construction debris. |
12/27/2023 | SITE | N/A | Partial Pass | Grading and construction activities |
12/27/2023 | SITE - Stormwater Setup and Controls | N/A | Partial Pass | Provide concrete containment as required |
05/28/2024 | Consultation SITE | N/A | Partial Pass | Actual address is, 401 N Bonita Ave, Intermountain Centers. All unfinished areas that are within the finished playground area are supposed to have Decomposed Granite as a finish product applied. This will have to be completed prior to the engineering final being approved for this area. |