Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TD-DEV-0323-00171
Permit Details
Apply Date:
03/15/2023
Applicant:
garrett Murphy
Description:
75.6 kW DC Photovoltaic Shade Canopies
Permit Reviews
Permit Number - TD-DEV-0323-00171
Permit Status: Complete
Permit Description: 75.6 kW DC Photovoltaic Shade Canopies
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/16/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 04/27/2023 | APPROVED |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0323-00171
Permite Description: 75.6 kW DC Photovoltaic Shade Canopies
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/06/2023 | PDSD Site/Engineering Division - Landscaping | N/A | Partial Pass | |
10/06/2023 | COT - SITE - Zoning Intermediate | N/A | Partial Pass | |
08/25/2023 | SITE - SWPPP Correction Notice | N/A | Complete (Recurring) | Site is clean and free of loose trash and debris. |
10/06/2023 | PDSD Site/Engineering Division - NPPO | N/A | Not Ready | |
08/25/2023 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | Site fence is complete and free of debris. |
08/17/2023 | PDSD Engineering Division Pre-Construction SITE | N/A | Not Ready | inform the contractor to Collison for the foundation inspections for the steel poles inform the contractor to call in inspections, every two weeks or as needed |
10/06/2023 | ENGR - Drainage Structures | N/A | Partial Pass |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0323-00171
Permit Description: 75.6 kW DC Photovoltaic Shade Canopies
Total Completed Inspections - 21