Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Address:
9800 E RITA RD
Apply Date:
03/15/2023
Applicant:
garrett Murphy
Description:
75.6 kW DC Photovoltaic Shade Canopies

Permit Reviews

Permit Number - TD-DEV-0323-00171
Permit Status: Complete
Permit Description: 75.6 kW DC Photovoltaic Shade Canopies
Start Date Submittal Complete Date Status  
03/16/2023 DEVELOPMENT PACKAGE REVIEW v.1 04/27/2023 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TD-DEV-0323-00171
Permite Description: 75.6 kW DC Photovoltaic Shade Canopies
Total Outstanding Inspections - 7
Last Inspection Date Description Inspector Results Comments
10/06/2023 PDSD Site/Engineering Division - Landscaping N/A Partial Pass
10/06/2023 COT - SITE - Zoning Intermediate N/A Partial Pass
08/25/2023 SITE - SWPPP Correction Notice N/A Complete (Recurring) Site is clean and free of loose trash and debris.
10/06/2023 PDSD Site/Engineering Division - NPPO N/A Not Ready
08/25/2023 SITE - Stormwater Setup and Controls N/A Complete (Recurring) Site fence is complete and free of debris.
08/17/2023 PDSD Engineering Division Pre-Construction SITE N/A Not Ready inform the contractor to Collison for the foundation inspections for the steel poles inform the contractor to call in inspections, every two weeks or as needed
10/06/2023 ENGR - Drainage Structures N/A Partial Pass

Completed Inspections

Permit Status: Complete
Permit Number: TD-DEV-0323-00171
Permit Description: 75.6 kW DC Photovoltaic Shade Canopies
Total Completed Inspections - 21
Date Description Inspector Results Comments
10/06/2023 SITE Passed
10/16/2023 PDSD Site/Engineering Division - Landscaping Passed
10/16/2023 COT - SITE - Zoning Intermediate Passed
10/16/2023 SITE - SWPPP Correction Notice Passed
10/16/2023 SITE - Zoning Violation Passed
10/16/2023 PDSD Site/Engineering Division - NPPO Passed
10/16/2023 SITE - SWPPP Violation Notice Passed
10/16/2023 SITE - Stormwater Setup and Controls Passed
10/16/2023 PDSD Engineering Division Pre-Construction SITE Passed
10/16/2023 COT - ENGR - Stormwater Passed
10/16/2023 COT - ENGR - Signage Final Passed
12/05/2023 ENGR - Drainage Structures Passed (2) column footers 12’ deep 24” width ready for concrete pour.
12/28/2023 Final inspection to ensure all landscape and water harvesting SITE Passed
12/28/2023 City of Tucson (COT) Planning and Development Services Engineering (ENGR) Zoning Compliance Inspection Passed
12/28/2023 COT - ENGR - Site - Assurance Release Passed
12/28/2023 SITE - Zoning Compliance Passed
12/28/2023 SITE - Stormwater Follow-up Passed
01/16/2024 ENGR Engineering Final Passed
01/16/2024 SITE - Stormwater Final Inspection Passed
01/16/2024 SITE - Zoning Final Passed
03/26/2024 ENGR Grading Final Passed