Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TD-DEV-0223-00143
Permit Details
Apply Date:
02/16/2023
Applicant:
Robert Franchimone
Description:
AutoZone Parts, Inc. #5928
Permit Reviews
Permit Number - TD-DEV-0223-00143
Permit Status: Complete
Permit Description: AutoZone Parts, Inc. #5928
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/14/2023 | DEVELOPMENT PACKAGE NEW v.1 | 10/30/2023 | APPROVED |
02/17/2023 | DEVELOPMENT PACKAGE REVIEW v.1 | 04/11/2023 | REQUIRES RESUBMIT |
05/18/2023 | DEVELOPMENT PACKAGE REVIEW v.2 | 06/22/2023 | REQUIRES RESUBMIT |
Outstanding Inspections
Permit Status: Complete
Permit Number: TD-DEV-0223-00143
Permite Description: AutoZone Parts, Inc. #5928
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/15/2024 | PDSD Site/Engineering Division - Landscaping | N/A | Partial Pass | Viewed pvc irrigation lines for the (3) water harvest island locations located on the East parking lot area, the front North basin, and South rear basin - (Okay to backfill) |
03/20/2024 | SITE - Stormwater Setup and Controls | N/A | Complete (Recurring) | All setup and controls are in place, no concerns at this time. |
03/20/2024 | COT - ENGR - Stormwater | N/A | Partial Pass | All curbs for site and island parking lot areas are completed and inlet areas leading to South, West, and North basin areas are in place. Noting on this inspection Mesh and #4 vertical and horizontal rebar for trash enclosure floor and apron footer are present and ready for pour. |
03/15/2024 | Final inspection to ensure all landscape and water harvesting SITE | N/A | Partial Pass | Viewed pvc irrigation lines for the (3) water harvest island locations located on the East parking lot area, the front North basin, and South rear basin - (Okay to backfill) |
04/17/2024 | ENGR Engineering Final | N/A | Canceled | This was for information only, final engineering will be called several weeks out from now. |
Completed Inspections
Permit Status: Complete
Permit Number: TD-DEV-0223-00143
Permit Description: AutoZone Parts, Inc. #5928
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/19/2024 | PDSD Engineering Division Pre-Construction SITE | Passed | Reviewed site plan with Superintendent Robert, went over basin locations located in front and rear of site. Robert will call in site inspection every 2 weeks. Went over landscape & nursery invoice requirement. Andy Vera did visit site and reviewed Trash enclosure dimensions and details and has approved engineered plan drawings with (2) Bollards added. |
|
01/22/2024 | ENGR - Drainage Structures | Passed | ||
03/20/2024 | SITE - Stormwater Follow-up | Passed | All curbs for site and island parking lot areas are completed and inlet areas leading to South, West, and North basin areas are in place. | |
05/29/2024 | Final inspection to ensure all landscape and water harvesting SITE | Passed | ||
05/29/2024 | ENGR Engineering Final | Passed | Ready for CO | |
05/29/2024 | LAND Landscape Appearance & Function Final | Passed | ||
05/29/2024 | COT - ENGR - Signage Final | Passed |