Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Development Package
Address:
1411 W AJO WY
Apply Date:
02/16/2023
Applicant:
Robert Franchimone
Description:
AutoZone Parts, Inc. #5928

Permit Reviews

Permit Number - TD-DEV-0223-00143
Permit Status: Issued
Permit Description: AutoZone Parts, Inc. #5928
Start Date Submittal Complete Date Status  
09/14/2023 DEVELOPMENT PACKAGE NEW v.1 10/30/2023 APPROVED Review Details
02/17/2023 DEVELOPMENT PACKAGE REVIEW v.1 04/11/2023 REQUIRES RESUBMIT Review Details
05/18/2023 DEVELOPMENT PACKAGE REVIEW v.2 06/22/2023 REQUIRES RESUBMIT Review Details

Outstanding Inspections

Permit Status: Issued
Permit Number: TD-DEV-0223-00143
Permite Description: AutoZone Parts, Inc. #5928
Total Outstanding Inspections - 5
Last Inspection Date Description Inspector Results Comments
03/15/2024 PDSD Site/Engineering Division - Landscaping N/A Partial Pass Viewed pvc irrigation lines for the (3) water harvest island locations located on the East parking lot area, the front North basin, and South rear basin - (Okay to backfill)
03/20/2024 SITE - Stormwater Setup and Controls N/A Complete (Recurring) All setup and controls are in place, no concerns at this time.
03/20/2024 COT - ENGR - Stormwater N/A Partial Pass All curbs for site and island parking lot areas are completed and inlet areas leading to South, West, and North basin areas are in place.

Noting on this inspection Mesh and #4 vertical and horizontal rebar for trash enclosure floor and apron footer are present and ready for pour.
03/15/2024 Final inspection to ensure all landscape and water harvesting SITE N/A Partial Pass Viewed pvc irrigation lines for the (3) water harvest island locations located on the East parking lot area, the front North basin, and South rear basin - (Okay to backfill)
04/17/2024 ENGR Engineering Final N/A Canceled This was for information only, final engineering will be called several weeks out from now.

Completed Inspections

Permit Status: Issued
Permit Number: TD-DEV-0223-00143
Permit Description: AutoZone Parts, Inc. #5928
Total Completed Inspections - 7
Date Description Inspector Results Comments
01/19/2024 PDSD Engineering Division Pre-Construction SITE Passed Reviewed site plan with Superintendent Robert, went over basin locations located in front and rear of site.

Robert will call in site inspection every 2 weeks.

Went over landscape & nursery invoice requirement.

Andy Vera did visit site and reviewed Trash enclosure dimensions and details and has approved engineered plan drawings with (2) Bollards added.
01/22/2024 ENGR - Drainage Structures Passed
03/20/2024 SITE - Stormwater Follow-up Passed All curbs for site and island parking lot areas are completed and inlet areas leading to South, West, and North basin areas are in place.
05/29/2024 Final inspection to ensure all landscape and water harvesting SITE Passed
05/29/2024 ENGR Engineering Final Passed Ready for CO
05/29/2024 LAND Landscape Appearance & Function Final Passed
05/29/2024 COT - ENGR - Signage Final Passed

Documents

File Name Document Type  
APPROVED_3_AUTOZONE DPP 09.13.2023_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
DEQ_FUGITIVEDUSTPERMIT_20231027_145611_V1.PDF DOCUMENTS VIEW
TD-DEV-0223-00143 3RD COMMENT LETTER 09.20.23.PDF DOCUMENTS VIEW
3_TP-MOD-0523-00013 DECISION LETTER PACKAGE & PDP 07.11.2023_V1 (1).PDF PLANS UNDER REVIEW VIEW
3_RECORDED AVIGATION EASEMENT & DISCLOSURE AGREEMENT_V1.PDF PLANS UNDER REVIEW VIEW
3_CROSS ACCESS EASEMENT DOCUMENTATION_V1 (1).PDF PLANS UNDER REVIEW VIEW
3_COMMENT RESPONSE LETTER DP_091323_V1 (1).PDF PLANS UNDER REVIEW VIEW
3_AUTOZONE DPP 09.13.2023_V1 (1).PDF PLANS UNDER REVIEW VIEW
3_TUCSON WATER EASEMENT ABANDONMENT - EMAIL FROM NICK MARTELL & STEPHEN BLOOD CONFIRMING CONDITION_V1.PDF PLANS UNDER REVIEW VIEW
TEP FACILITIES MAP.PDF DOCUMENTS VIEW
APPROVED DEVELOPMENT LETTER.PDF DOCUMENTS VIEW
2_AUTOZONE 2ND SUB DPP_V2.PDF DOCUMENTS VIEW
2_COMMENT RESPONSE LETTER DP - 05-15-2023_V1.PDF DOCUMENTS VIEW
2_REZONING CONDITIONS C9-09-10 - RESPONSE 05-15-2023_V1.PDF DOCUMENTS VIEW
2_PCRWRD APPROVAL - TYPE 1 SEWER CAPACITY - P23WC00155_V2.PDF DOCUMENTS VIEW
2_ AUTOZONE 2ND SUB DRAINAGE REPORT_V2.PDF DOCUMENTS VIEW
2A_AUTOZONE 2ND SUB DPP 05-18-2023_V1.PDF DOCUMENTS VIEW
2_REZONING CONDITIONS C9-09-10 - RESPONSE 05-15-2023_V1.PDF PLANS UNDER REVIEW VIEW
2_PCRWRD APPROVAL - TYPE 1 SEWER CAPACITY - P23WC00155_V2.PDF PLANS UNDER REVIEW VIEW
2_PCRWRD APPROVAL - TYPE 1 SEWER CAPACITY - P23WC00155_V1.PDF PLANS UNDER REVIEW VIEW
2_COMMENT RESPONSE LETTER DP - 05-15-2023_V1.PDF PLANS UNDER REVIEW VIEW
2_ AUTOZONE 2ND SUB DRAINAGE REPORT_V2.PDF PLANS UNDER REVIEW VIEW
2A_AUTOZONE 2ND SUB DPP 05-18-2023_V1.PDF PLANS UNDER REVIEW VIEW
1_AUTOZONE 5928 NPPE_V1.PDF PLANS UNDER REVIEW VIEW
1_AUTOZONE 5928 DRAINAGE REPORT_V1.PDF PLANS UNDER REVIEW VIEW
1_AUTOZONE 5928 DPP_V1 (1).PDF PLANS UNDER REVIEW VIEW